
tube F1, sealed edge first (90 minutes epoxy). Remove excess glue.
●
Figure 3 Align the spar tube assembly flush with the connecting rib and perpendicular
using the tape to hold it in place. Leave to dry, and then remove the tape.
55
Small parts
bag
Parts F68
●
Checkfit alignment pin F68 into the holes in combined ribs F22/F23/F22. Ensure that it
will mate with the matching hole in the combined ribs F6/F4/F6. Glue in place (90
minutes epoxy).
●
Apply a fillet of epoxy to all joints between the spars and the connecting/end ribs
(90 minutes epoxy).
Summary of Contents for F5J
Page 38: ......