73
Scorpion 4, 6 and 8
The operator must ensure that the tool is fully meshed when
the tool is lifted off the ground and before leaving the cabin.
9. The assembly is then secured with bolt, nut and split.
Remember to maintain a high level of cleanliness
in connection with hydraulics. Clean any screwed connection or
quick release couplings.
10. Mount the hoses, either by using screw joints or flat face quick release couplings,
see the section
Fejl! Henvisningskilde ikke fundet.
.
Always remember to lock the quick release couplings by
turning the pull ring. To avoid accidental disconnection when a
branch sweeps over the quick release coupling.
Demounting attachment tools
Demounting tools from the boom mower is done in reverse order of the mounting
procedure, see the section
Fejl! Henvisningskilde ikke fundet.
.
The tool is positioned on a solid surface. If possible, on a pallet so it can be moved
more easily.
No person or animal are allowed in the entire working area of the
mower if operation is carried out from the driver's cabin.
Summary of Contents for Scorpion 330-4 S
Page 1: ...1 Edition 2020 ...
Page 2: ......
Page 26: ...26 Scorpion 4 6 and 8 Hydraulic diagram Scorpion 4 e ...
Page 95: ......