SELECTING ELECTRIC or DIESEL DRIVE
ELECTRIC DRIVE
Make sure that the engine throttle lever is in neutral
position.
Set the Hybrid switch to ELECTRIC.
Turn the DIESEL engine key to the »ON« position.
-GREEN LIGHT on the panel switches on.
Wait for cca 5 seconds for the system to set to the
electric drive.
Ready to sail
Switching the Electric drive OFF –Turn the DIESEL
engine key to the »OFF«
position.
GREEN LIGHT on the panel switches off
DIESEL DRIVE
Make sure that the engine throttle lever is in neutral
position.
Set the Hybrid switch to DIESEL.
Turn the DIESEL engine key to the »ON« position.
- YELLOW LIGHT on the panel switches on.
-»NEUTRAL« should appear on the VW control
display (
if not, check the position of the throttle lever
).
Turn the DIESEL engine key to the »START« position
to start the engine.
Ready to sail.
Switching the Diesel drive OFF – Turn the DIESEL
engine key to the »OFF«
position.
YELLOW LIGHT on the panel switches off
There are also important monitors for the hybrid drive parameters. For details see Hybrid monitoring
(chapter 3.) propulsion/generator and Battery monitoring – BMV.
CAUTION!
If switching from electro to diesel (step 1) after step 2: first put the
throttle lever in neutral, turn the hybrid switch to diesel and wait for 5
seconds before starting the diesel engine, allowing the clutch to
reconnect the diesel engine.
CAUTION!
In electric drive the alternator is not turning. You have to turn 12 V
charger ON to supply continuous power to hybrid cooling pump.
(Inverter ON, F39 ON, F40 ON)
Summary of Contents for GREENLINE 33
Page 1: ...OWNER S MANUAL GREENLINE 33 Revision 04 19 03 2012...
Page 2: ...Greenline 33 II...
Page 6: ...Greenline 33 VI Figure 38 Position of hoisting cradle and straps 88...
Page 13: ...Greenline 33 6 Figure 1 Boat main dimensions...
Page 16: ...Greenline 33 9 Figure 2 Boat examination report...
Page 17: ...Greenline 33 10 Figure 3 Engine examination certificate VW SDI 75 5...
Page 18: ...Greenline 33 11 Figure 4 Engine examination certificate VW TDI 165 5...
Page 19: ...Greenline 33 12 Figure 5 Declaration of Conformity...
Page 20: ...Greenline 33 13...
Page 25: ...Greenline 33 18 MAN OVERBOARD PREVENTION AND RECOVERY Figure 8 Working deck area plan...
Page 34: ...Greenline 33 27 Figure 14 Bilge pump system plan...
Page 36: ...Greenline 33 29 4 HULL THROUGH HULL FITTINGS Figure 16 Thru hull fitting positions...
Page 48: ...Greenline 33 41 7 PLUMBING Sea water plumbing Figure 22 Sea water plumbing...
Page 49: ...Greenline 33 42 Freshwater plumbing Figure 23 Fresh water plumbing...
Page 50: ...Greenline 33 43 Grey water plumbing Figure 24 Grey water plumbing...
Page 58: ...Greenline 33 51 Picture 5 INVERTER switch Phoenix multi control on the dashboard...
Page 74: ...Greenline 33 67 Picture 13 Main 12V power box Picture 14 Service box fuses...
Page 76: ...Greenline 33 69 Picture 17 Shore power fuse Picture 18 LiPo battery bank main fuse...
Page 77: ...Greenline 33 70 Picture 19 Hybrid box fuses Picture 20 Hybrid control unit main fuse...
Page 99: ...Greenline 33 92 UN MOUNTING LIPO BATTERY BANK 8 STEPS Picture 1 Step 1 Picture 2 Steps 2 7...
Page 100: ...Greenline 33 93 Picture 3 Step 7 Picture 4 Step 8 Step 1...
Page 102: ...Greenline 33 95 12 APPENDIX A Wiring diagrams...
Page 108: ...Greenline 33 101 14 NOTES...
Page 109: ...Greenline 33 102...
Page 110: ...Greenline 33 103...