Greenline 33
4
2.
SPECIFICATION & WARRANTIES
SPECIFICATION
Parameter
Symbol
Units
Value
Length
maximum length
L
MAX
m
9,99
length of hull
L
H
m
9,99
length of waterline (at DWL)
L
WL
m
9,85
Beam
maximum beam
B
MAX
m
3,49
beam of hull
B
H
m
3,47
beam of waterline (at DWL)
B
wl
m
3,07
Depth
maximum depth
D
MAX
m
2,02
midship depth
D
LWL/2
m
1,86
Freeboard
freeboard forward
F
F
m
1,56
freeboard midship
F
M
m
1,31
freeboard aft
F
A
m
1,09
Draught
canoe body draught
T
C
m
0,575
maximum draught (LDC displacement)
T
MAX
m
0,750
Height
air draught (at DWL,excluding antenna)
H
A
m
3,10
Displacement
volume displacement (at DWL)
V
D
kg
5700
light craft condition mass (LCC)
m
LCC
kg
5100
minimum operation condition (MOC)
m
MCC
kg
5310
loaded craft mass (LDC)
m
LDC
kg
6800
maximum load
m
MTL
kg
1700
immersion (at DWL)
kg/cm
209
Engine
number of engines
1
model
VW SDI 75-5
maximum power at crankshaft
kW(HP)
55(75)
maximum speed of crankshaft
RPM
3600
dry weight
kg
245
model (option)
VW TDI 230-6
maximum power at crankshaft (option)
kW(HP)
175(230)
maximum speed of crankshaft (option)
RPM
4200
dry weight (option)
kg
330
Performance
maximum design speed (loaded craft)
kts
15
Batteries
HYBRID (LiPo); (option)
Ah (V)
240(48)
ENGINE (Lead Acid)
Ah (V)
100(12)
SERVICE (AGM)
Ah (V)
130(12)
Tankage
fuel tank STB
L
250
Summary of Contents for GREENLINE 33
Page 1: ...OWNER S MANUAL GREENLINE 33 Revision 04 19 03 2012...
Page 2: ...Greenline 33 II...
Page 6: ...Greenline 33 VI Figure 38 Position of hoisting cradle and straps 88...
Page 13: ...Greenline 33 6 Figure 1 Boat main dimensions...
Page 16: ...Greenline 33 9 Figure 2 Boat examination report...
Page 17: ...Greenline 33 10 Figure 3 Engine examination certificate VW SDI 75 5...
Page 18: ...Greenline 33 11 Figure 4 Engine examination certificate VW TDI 165 5...
Page 19: ...Greenline 33 12 Figure 5 Declaration of Conformity...
Page 20: ...Greenline 33 13...
Page 25: ...Greenline 33 18 MAN OVERBOARD PREVENTION AND RECOVERY Figure 8 Working deck area plan...
Page 34: ...Greenline 33 27 Figure 14 Bilge pump system plan...
Page 36: ...Greenline 33 29 4 HULL THROUGH HULL FITTINGS Figure 16 Thru hull fitting positions...
Page 48: ...Greenline 33 41 7 PLUMBING Sea water plumbing Figure 22 Sea water plumbing...
Page 49: ...Greenline 33 42 Freshwater plumbing Figure 23 Fresh water plumbing...
Page 50: ...Greenline 33 43 Grey water plumbing Figure 24 Grey water plumbing...
Page 58: ...Greenline 33 51 Picture 5 INVERTER switch Phoenix multi control on the dashboard...
Page 74: ...Greenline 33 67 Picture 13 Main 12V power box Picture 14 Service box fuses...
Page 76: ...Greenline 33 69 Picture 17 Shore power fuse Picture 18 LiPo battery bank main fuse...
Page 77: ...Greenline 33 70 Picture 19 Hybrid box fuses Picture 20 Hybrid control unit main fuse...
Page 99: ...Greenline 33 92 UN MOUNTING LIPO BATTERY BANK 8 STEPS Picture 1 Step 1 Picture 2 Steps 2 7...
Page 100: ...Greenline 33 93 Picture 3 Step 7 Picture 4 Step 8 Step 1...
Page 102: ...Greenline 33 95 12 APPENDIX A Wiring diagrams...
Page 108: ...Greenline 33 101 14 NOTES...
Page 109: ...Greenline 33 102...
Page 110: ...Greenline 33 103...