Greenline 33
79
dead stop,
-
Refer to the engine manufacture’s brochure before starting up the engine.
VENTILATION SYSTEM
Do not obstruct or modify the ventilation system.
Figure 30: Engine compartment air intake
Figure 31: Engine compartment air outlet with exhaust
blower
DETERMINATION OF MAXIMUM PROPULSION POWER RATING
Maximum propulsion power rating for the craft 1 X 175 kW.
Do not operate this craft with an engine of rated power larger than that posted on the capacity label in the
craft
Do not operate at maximum speed while in congested high traffic waterways or in weather and sea conditions
of reduced visibility high winds or large waves. Reduce speed and wake as a courtesy and as a safety
consideration to yourself and others. Observe and obey speed limit and no wake zones.
Observe right-of-way as defined by Rules of the Road and required by COLREG.
Always be certain to have sufficient distance to stop or manoeuvre if required to avoid collisions.
DASH BOARD / CONTROL LEVER
All engine controls are located on the dash board, which does not require any special pre-cautions (refer to
engine brochure).
Summary of Contents for GREENLINE 33
Page 1: ...OWNER S MANUAL GREENLINE 33 Revision 04 19 03 2012...
Page 2: ...Greenline 33 II...
Page 6: ...Greenline 33 VI Figure 38 Position of hoisting cradle and straps 88...
Page 13: ...Greenline 33 6 Figure 1 Boat main dimensions...
Page 16: ...Greenline 33 9 Figure 2 Boat examination report...
Page 17: ...Greenline 33 10 Figure 3 Engine examination certificate VW SDI 75 5...
Page 18: ...Greenline 33 11 Figure 4 Engine examination certificate VW TDI 165 5...
Page 19: ...Greenline 33 12 Figure 5 Declaration of Conformity...
Page 20: ...Greenline 33 13...
Page 25: ...Greenline 33 18 MAN OVERBOARD PREVENTION AND RECOVERY Figure 8 Working deck area plan...
Page 34: ...Greenline 33 27 Figure 14 Bilge pump system plan...
Page 36: ...Greenline 33 29 4 HULL THROUGH HULL FITTINGS Figure 16 Thru hull fitting positions...
Page 48: ...Greenline 33 41 7 PLUMBING Sea water plumbing Figure 22 Sea water plumbing...
Page 49: ...Greenline 33 42 Freshwater plumbing Figure 23 Fresh water plumbing...
Page 50: ...Greenline 33 43 Grey water plumbing Figure 24 Grey water plumbing...
Page 58: ...Greenline 33 51 Picture 5 INVERTER switch Phoenix multi control on the dashboard...
Page 74: ...Greenline 33 67 Picture 13 Main 12V power box Picture 14 Service box fuses...
Page 76: ...Greenline 33 69 Picture 17 Shore power fuse Picture 18 LiPo battery bank main fuse...
Page 77: ...Greenline 33 70 Picture 19 Hybrid box fuses Picture 20 Hybrid control unit main fuse...
Page 99: ...Greenline 33 92 UN MOUNTING LIPO BATTERY BANK 8 STEPS Picture 1 Step 1 Picture 2 Steps 2 7...
Page 100: ...Greenline 33 93 Picture 3 Step 7 Picture 4 Step 8 Step 1...
Page 102: ...Greenline 33 95 12 APPENDIX A Wiring diagrams...
Page 108: ...Greenline 33 101 14 NOTES...
Page 109: ...Greenline 33 102...
Page 110: ...Greenline 33 103...