Greenline 33
76
- Turn OFF all main switches (S1-S6)
- Disconnect shore power (see shore power chapter)
- Turn OFF fuse F38 and F39.
- Leave F17-F23 always ON (also written on DC panel)
- It is highly recommended to turn OFF F11 (cockpit lights)
CAUTION!
Winter storage:
For winter storage it is recommended to turn OFF all the consumers
from boat batteries.
- Turn OFF all main switches (S1-S6)
- Disconnect shore power (see shore power chapter)
- Turn OFF fuse F38 and F39.
- Turn OFF F11 (cockpit lights)
- You can also turn OFF diesel heater (F20,
make sure that it is cooled
before turning OFF
)
- In water leave F17 ON (bilge pump)
- Out of water turn OFF F17 (bilge pump)
CAUTION!
Winter storage LiPo battery bank:
To prevent LiPo battery from damaging you have to store it in
temperature range from -20°C to +60°C at SOC 40% - 60% (app. 48V). In
case when the boat can not be stored in this temperature range, you
have to un-mount the LiPo battery and store it somewhere else to meet
the temperature range.
Summary of Contents for GREENLINE 33
Page 1: ...OWNER S MANUAL GREENLINE 33 Revision 04 19 03 2012...
Page 2: ...Greenline 33 II...
Page 6: ...Greenline 33 VI Figure 38 Position of hoisting cradle and straps 88...
Page 13: ...Greenline 33 6 Figure 1 Boat main dimensions...
Page 16: ...Greenline 33 9 Figure 2 Boat examination report...
Page 17: ...Greenline 33 10 Figure 3 Engine examination certificate VW SDI 75 5...
Page 18: ...Greenline 33 11 Figure 4 Engine examination certificate VW TDI 165 5...
Page 19: ...Greenline 33 12 Figure 5 Declaration of Conformity...
Page 20: ...Greenline 33 13...
Page 25: ...Greenline 33 18 MAN OVERBOARD PREVENTION AND RECOVERY Figure 8 Working deck area plan...
Page 34: ...Greenline 33 27 Figure 14 Bilge pump system plan...
Page 36: ...Greenline 33 29 4 HULL THROUGH HULL FITTINGS Figure 16 Thru hull fitting positions...
Page 48: ...Greenline 33 41 7 PLUMBING Sea water plumbing Figure 22 Sea water plumbing...
Page 49: ...Greenline 33 42 Freshwater plumbing Figure 23 Fresh water plumbing...
Page 50: ...Greenline 33 43 Grey water plumbing Figure 24 Grey water plumbing...
Page 58: ...Greenline 33 51 Picture 5 INVERTER switch Phoenix multi control on the dashboard...
Page 74: ...Greenline 33 67 Picture 13 Main 12V power box Picture 14 Service box fuses...
Page 76: ...Greenline 33 69 Picture 17 Shore power fuse Picture 18 LiPo battery bank main fuse...
Page 77: ...Greenline 33 70 Picture 19 Hybrid box fuses Picture 20 Hybrid control unit main fuse...
Page 99: ...Greenline 33 92 UN MOUNTING LIPO BATTERY BANK 8 STEPS Picture 1 Step 1 Picture 2 Steps 2 7...
Page 100: ...Greenline 33 93 Picture 3 Step 7 Picture 4 Step 8 Step 1...
Page 102: ...Greenline 33 95 12 APPENDIX A Wiring diagrams...
Page 108: ...Greenline 33 101 14 NOTES...
Page 109: ...Greenline 33 102...
Page 110: ...Greenline 33 103...