GREE DC Inverter Side Discharge VRF
Ⅱ
for North America
121
Removal operation for 4-way valve
Remark: Before removing the 4-way val
ve, please make sure that there’s no refrigerant inside the pipeline of system
and then power is disconnected.
Process
Photo
Operation Instruction
2.Disconnect
the 4-way valve
and connection
pipeline
● Weld those 4
connection spots on
4-way valve, and
then pull out the
connection pipe
Note: During welding
process, do not let
the flae burn out
other parts
3. Replace
4-way valve
● Replace 4-way
valve
Note: During welding
process, do not let
the flame burn out
other parts
4. Replace
4-way valve
● Weld the
connection position
between 4-way valve
and pipeline
Note: During welding
process, do not let
flame burn out other
parts
Summary of Contents for GMV-24WL/C-T
Page 4: ...GREE DC Inverter Side Discharge VRF for North America 1 PRODUCT...
Page 12: ...GREE DC Inverter Side Discharge VRF for North America 9 CONTROL...
Page 17: ...GREE DC Inverter Side Discharge VRF for North America 14...
Page 18: ...GREE DC Inverter Side Discharge VRF for North America 15 Button Graphics...
Page 65: ...GREE DC Inverter Side Discharge VRF for North America 62 Switchover of Software Languages...
Page 66: ...GREE DC Inverter Side Discharge VRF for North America 63 INSTALLATION...
Page 98: ...GREE DC Inverter Side Discharge VRF for North America 95 MAINTENANCE...
Page 150: ...JF00302320...