GREE DC Inverter Multi VRF System II Service Manual
132
Removal operation of compressor
Remark: Before removing the compressor, please make sure that there’s no refrigerant inside the pipeline and the power
is disconnected.
Process
Photo
Operation
Instruction
6. Connect
suction pipe and
discharge pipe of
copressor and
pipeline of
system again
Weld the
connection pipe of
compressor,
connect the pipeline
and compressor
Note: During
welding process, do
not let flame burn
out other parts
7. Connect the
power cord of
compressor well
● Loose screws
fixing the power
cord with
screwdriver
● conenct the
power cord well
again
Note: When
connecting the
power cord, make
marks for different
color power cords
and corresponding
wiring terminals.
Summary of Contents for GMV-100WL/A-T
Page 1: ...DC INVERTER VRF SYSTEM SERVICE MANUAL R410A...
Page 4: ...DC INVERTER VRF SYSTEM II SERVICE MANUAL R410A PRODUCT...
Page 16: ...GREE DC Inverter Multi VRF System II Service Manual 12 GMV 141WL C T...
Page 18: ...GREE DC Inverter Multi VRF System II Service Manual 14 CONTROL...
Page 64: ...GREE DC Inverter Multi VRF System II Service Manual 60 INSTALLATION...
Page 72: ...GREE DC Inverter Multi VRF System II Service Manual 68 DEBUGGING MAINTENANCE...
Page 173: ...JF00302323...