GREE GMV5E DC INVERTER VRF UNITS SERVICE MANUAL
129
2) Solution of project number conflict:
①
Manual setting on the commissioning software:
Use the commissioning software to set IDUs' project numbers separately in every system or reset
projects numbers in multiple systems.
Choose Setting -> Parameter Settings, as shown in Figure 2:
Figure 2
If project commissioning is finished and the IDU where the conflict occurs needs to be set separately.
Click Project Number Conflict, as shown in Figure 3. The pop-up box comprises two parts: conflicting
IDU box, showing the IDU's project number, system number and time; setting box, showing the IDU
project number setting and setting button.
Figure 3