Chapter V GW4D20 / GW4D20B Turbocharged Diesel Engine
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
317
Fig. 5-14-20 Installing the earthing cable of
storage battery
After the installation, please carry out the following
operations.
(1) Connect the earthing cable of storage battery. See
Fig. 5-14-20.
(2) Fill the lubricating oil in the lubrication system.
(3) Start the engine, check its working condition and
make sure the lubrication system is in normal operation.