MAINTENANCE MANUAL OF GW4D20/GW4D20B TURBOCHARGED DIESEL ENGINES
178
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
Section V Piston and connecting rod assembly
Fig. 4-5-1 Dismounting and reinstallation procedure for piston and connecting rod assembly
Dismounting procedure
①
Engine accessories
②
Timing system
③
Cylinder head assembly
④
Oil pan upper and lower body assemblies and oil
collector assembly
⑤
Connecting rod cover
⑥
Piston and connecting rod assembly
⑦
Piston ring
⑧
Clip
⑨
Piston pin
⑩
Piston component
Reinstallation procedure
Reinstall them in the opposite order of dismounting