Chapter XI Electrical System
Great Wall Baoding Internal Combustion Engine
Manufacturing Company Limited
477
3. On-board Maintenance
Fig. 11-3-10 Removal and reinstallation procedures of the generator assembly
Removal procedure
①
Generator terminals and
harness plug
②
Generator belt
③
Generator assembly
Reinstallation procedure
Reinstalling them in the
opposite order of removal