6
Panel Installation
Unpacking
Unpacking
The ATP-2000 is supplied in dedicated packaging provided by the manufacturer and should
not be accepted if delivered in inferior or unauthorized materials.
1 Carefully unpack the components and check them against the listed items here:
• 1x ATP-2000 control panel unit.
• 1x Accessory box containing:
• 1x DC power supply module;
• AC power cords (1x US, 1x GB, 1x Eu); and
• 1x 5m Ethernet cable.
• 1x ATP-2000 Welcome Note.
If there is anything incorrect, then notify your Grass Valley Partner, or Grass Valley, at
once. (See
Grass Valley Technical Support
.)
2 Check that the equipment has not been damaged in transit.
If any damage has occurred notify your Grass Valley Partner (or Grass Valley directly)
and the carrier immediately.
3 Always retain the original packing materials if possible, they could prove useful should
it ever be necessary to transport or ship the equipment.
4 Always read the installation and the user instructions carefully, it will provide you with
helpful hints and tips about care and maintenance and help you get the most out of
your ATP-2000 Advanced Touch Panel.
5 Place the unit on a suitable surface for preliminary inspection.
Summary of Contents for ATP-2000
Page 1: ...User Guide 13 03082 230 AA 24 November 2020 ATP 2000 ADVANCED TOUCH PANEL ...
Page 4: ...iv Notices ...
Page 21: ...xxi Table of Contents ...
Page 25: ...4 Introduction This Document ...
Page 41: ...20 Getting Started Configure Initial Settings in the Control Screen ...
Page 47: ...26 ATP 2000 Control Screen Web Page ATP 2000 Control Screen Web Page ...
Page 67: ...46 Maintenance Replacing the Battery ...
Page 73: ...52 Hardware Specification External Connectors ...
Page 75: ...54 Unit Dimensions ...
Page 80: ...59 Power Supply Unit Power Supply Unit DC Power Supply Module 60 Physical 60 Electrical 60 ...
Page 89: ...68 Battery Replacement Step 6 Re Install in Rack ...