
4.2 Flashloader 4.2
4 Programming
Example: Basket drive ticked, basket drive out port forced, basket drive motor running.
3. The inputs are displayed in the “InPorts” field on the computer screen.
-
time
-
temperature settings
-
and tank levels (No level<500, Level>500.)
are displayed at the top of the screen.
4. Always finish the session by pushing “Run from machine”. Restart the machine and
make sure it runs.
Tip:When looking at the ticks on “In Ports” always look for changes when the sensor/function
is manipulated. (By hand or using the Out Ports.)
In this mode no information is shown on the machine’s display.
4.2.5 Uploading
NOTE
If the main PCB is replaced all data is lost, if possible read out the values for
Service and Granules before the PCB is exchanged. The values are then
noted and can be entered using Flashloader after the new PCB is installed.
1. Connect the computer by pressing “Autodetect” and then select “Run from Flash”. (if not
done in previous section.)
2. Update date and time in the PC settings by selecting “Set Time”.
NOTE
Check the time and date on the PC. The machine will be set to the time
setting of the PC.
34
Rev. 2012-05
Summary of Contents for Granule Maxi
Page 2: ......
Page 6: ...CE Declaration of Conformity ...
Page 13: ...2 Installation 2 1 Installation instructions Figure 2 Rev 2012 05 13 ...
Page 22: ...2 3 How to lay the Granule Maxi down on its side 2 Installation ...
Page 44: ...5 Routines for long time storage ...
Page 46: ...6 Warranty ...
Page 54: ...7 2 Service instructions 2 year service 7 Maintenance and Service ...
Page 57: ...8 Steam heating Granule Maxi 8 5 Connection Steam connections Rev 2012 05 57 ...
Page 59: ...8 Steam heating Granule Maxi 8 7 Diagrams 8 7 Diagrams Diagram 1 Diagram 2 Rev 2012 05 59 ...
Page 60: ...8 7 Diagrams 8 Steam heating Granule Maxi Diagram 3 Diagram 4 60 Rev 2012 05 ...
Page 62: ...9 Appendix This page intentionally left blank 62 Rev 2012 05 ...
Page 69: ...69 200 230 V 400 415 V CW ...
Page 70: ...70 200 230 V 400 415 V CW ...
Page 71: ...71 200 230 V 400 415 V CW ...
Page 72: ...72 200 230 V 400 415 V CW ...
Page 73: ...73 200 230 V 400 415 V CW ...
Page 74: ...74 200 230 V 400 415 V CW ...
Page 75: ...75 208 575 V CSA ...
Page 76: ...76 208 575 V CSA ...
Page 77: ...77 208 575 V CSA ...
Page 78: ...78 208 575 V CSA ...
Page 79: ...79 208 575 V CSA ...
Page 80: ...80 208 575 V CSA ...
Page 81: ...81 230 400 415 V Steam heated ...
Page 82: ...82 230 400 415 V Steam heated ...
Page 83: ...83 230 400 415 V Steam heated ...
Page 84: ...84 230 400 415 V Steam heated ...
Page 85: ...85 230 400 415 V Steam heated ...
Page 86: ...86 380 400 415 440 480 V ...
Page 87: ...87 380 400 415 440 480 V ...
Page 88: ...88 380 400 415 440 480 V ...
Page 89: ...89 380 400 415 440 480 V ...
Page 90: ...90 380 400 415 440 480 V ...
Page 91: ...91 380 400 415 440 480 V ...
Page 92: ...92 575 V CSA Steam heated ...
Page 93: ...93 575 V CSA Steam heated ...
Page 94: ...94 575 V CSA Steam heated ...
Page 95: ...95 575 V CSA Steam heated ...
Page 96: ...96 575 V CSA Steam heated ...
Page 97: ...97 575 V CSA Steam heated ...