Operation
3A6165J
19
Operation
Startup
1. Use the supply systems to load the fluid.
NOTE:
The EFR is tested with oil at the factory. Flush
out the oil with a compatible solvent before dispensing.
a. Check that all machine connections are tight
-
ened. See
on page 15.
b. Verify both feed supply systems are connected
to an air supply.
c. Turn the power disconnect switch (C) to the ON
position.
d. Verify the machine is ON and the system status
indicator (AB) is solid green. See
on page 11.
e. Turn both PRESSURE RELIEF/DISPENSE
valves (R, S) to DISPENSE (pointing toward the
outlet pressure gauges).
f.
Start the supply systems. See
on page 21.
g. Use supply systems to load the system.
h. To prime the pump, cycle the pump a few times
or until air-free fluid dispenses. See
on page 45 for instructions on priming
the pump through the ADM.
i.
Hold the dispense valve nose piece, without a
mixer installed, over two grounded waste con
-
tainers. Leave the mixer off and trigger the dis
-
pense valve until both fluids flow freely from the
nose piece without any air.
j.
With the valve closed, install the required mixer
on the dispense valve. Refer to your dispense
valve manual.
R
S
Keep Components A and B Separate
Cross-contamination can result in cured material in
fluid lines which could damage equipment or cause
serious injury if injected or splashed on skin or in
eyes. To prevent cross-contamination of the equip
-
ment’s wetted parts,
never
interchange component A
and component B parts.
To prevent serious injury from splashing, dispense
fluids at a low pressure.