Grounding
Grounding
Grounding
This equipment must be grounded to reduce the
risk of static sparking and electric shock. Electric
or static sparking can cause fumes to ignite or
explode. Improper grounding can cause electric
shock. Grounding provides an escape wire for the
electric current.
1.
Pump:
Pump:
Pump: Loosen the ground screw and attach a
ground wire. Tighten the ground screw securely.
Connect the other end of the ground wire to a
true earth ground.
NOTE:
NOTE:
NOTE: Both pumps are connected to a common
control module and must be grounded to the
same ground point. Different ground points
(unequal potential) may cause current to flow
through component cables, causing incorrect
signals.
2.
Fluid
Fluid
Fluid hoses:
hoses:
hoses: Use only electrically conductive
hoses with a maximum of 500 ft. (150 m)
combined hose length to ensure grounding
continuity. Check the electrical resistance of
hoses. If total resistance to ground exceeds 25
megohms, replace hose immediately
3.
Fluid
Fluid
Fluid supply
supply
supply container:
container:
container: Follow your local code.
4.
Solvent
Solvent
Solvent pails
pails
pails used
used
used when
when
when flushing:
flushing:
flushing: Follow local
code. Use only conductive metal pails, placed
on a grounded surface. Do not place the pail
on a non-conductive surface, such as paper or
cardboard, which interrupts grounding continuity.
5.
To
To
To maintain
maintain
maintain grounding
grounding
grounding continuity
continuity
continuity when
when
when flushing
flushing
flushing
or
or
or relieving
relieving
relieving pressure:
pressure:
pressure: Hold metal part of the spray
gun or valve firmly to the side of a grounded
metal pail, then trigger the gun or open the valve.
Fluid
Fluid
Fluid Line
Line
Line Accessories
Accessories
Accessories
Install the following accessories in the order shown
in the
Typical Installation Diagram, page 12
, using
adapters as necessary.
NOTE:
NOTE:
NOTE: All fluid lines and accessories must be rated
to the maximum working pressure of 400 psi (2.8
MPa, 28.0 bar).
• Fluid
Fluid
Fluid drain
drain
drain valve
valve
valve (H):
(H):
(H): required in your system, to
relieve fluid pressure in the hose and circulation
system.
• Fluid
Fluid
Fluid pressure
pressure
pressure gauge
gauge
gauge (E):
(E):
(E): for more precise
adjustment of the fluid pressure.
• Fluid
Fluid
Fluid shutoff
shutoff
shutoff valve
valve
valve (F):
(F):
(F): shuts off fluid flow.
Fill
Fill
Fill With
With
With Oil
Oil
Oil Before
Before
Before Using
Using
Using Equipment
Equipment
Equipment
Before using the equipment, open the fill cap (P) and
add Graco Part No. 16W645 ISO 220 silicone-free
synthetic gear oil. Check the oil level in the sight glass
(K). Fill until the oil level is near the halfway point of
the sight glass. The oil capacity is approximately 1.5
quarts (1.4 liters). Do
Do
Do not
not
not overfill.
overfill.
overfill.
NOTE:
NOTE:
NOTE: Four 1 quart (0.95 liter) bottles of oil are
supplied with the equipment.
Flush
Flush
Flush Before
Before
Before Using
Using
Using Equipment
Equipment
Equipment
The pump fluid section was tested with lightweight
oil, which is left in the fluid passages to protect parts.
To avoid contaminating your fluid with oil, flush the
equipment with a compatible solvent before using
the equipment.
16
3A3453H