![grabner TRIMARAN Owner'S Manual Download Page 20](http://html.mh-extra.com/html/grabner/trimaran/trimaran_owners-manual_2249629020.webp)
20
►
►
Shackle the shrouds to port and star-
board to the eye bolt nuts of the bridge-
yoke.
►
►
Fasten the the bridge-yoke to the fixing
frame unit by means of the 4 knurled nuts
►
►
Inflate the boat to operating pressure.
►
►
Attach the furling drum to the stemhead-
strake by means of the large shackle.
►
►
Feed the furling line through the clamcle-
at located on the fixing frame base plate.
►
►
Fasten the end of the furling line to clam-
cleats eyelet to avoid accidental tail end
loss of the line.
►
►
Clip carbine attached to the jibs tack, to
the furling drum.
IMPORTANT
►
►
Turn the bolt of the shackle by 180°
until it locks into the notch on the
shank.
►
►
Do not use tools to squeeze the
shackles shanks.
►
►
If the shackle has lost tension and
does not noticeably lock into the
notch, replace it, or prize the shanks
open a little until sufficient tension is
restored.
►
►
Always check shackle tension prior to
assembly.
CORRECT WRONG