A C RO SS THE DEC K)
5/ 4 X 6 X 58"
DEC K BO A RD
2 X 4 X 30-3/ 4"
UPPER LEVEL C ENTER
DEC K SUPPO RT
(PLA C ED UNDERNEA TH DEC K
A FTER DEC K BO A RDS A RE LA ID
NO TE: IF YO U PURC HA SED
THE BIG SKYE II THIS BO A RD
W ILL NO T BE INSTA LLED
16
4
"
1
4
"
"
3
"
1
4"
1
2
2
26
1
1
"
15
2
2
1
8
"
© 2009 G O RILLA PLA YSETS
THE FO LLO W ING STEP IS REC O MMENDED TO PREVENT PO SSIBLE SPLITS IN THE W O O D
1: PRE-DRILL THE ENDS O F THE DEC K BO A RDS TO PREVENT INSTA LLA TIO N DA MA G E. PRE-DRILL BO TH ENDS W ITH A
1/ 8" DRILL BIT A T THE DIMENSIO NS SHO W N BELO W .
2: STA RT W ITH A 5/ 4 X 6 X 58" DEC K BO A RD A T O NE END O F THE FO RT. C ENTER THE BO A RD BETW EEN THE REA R
BO TTO M PA NEL BO A RDS A ND LEA VE A UNIFO RM SPA C E BETW EEN THE DEC K BO A RDS. LA Y A LL DEC K BO A RDS
A C RO SS THE DEC K SUPPO RTS BEFO RE SEC URING THEM TO THE FO RT. THIS W ILL ENSURE THA T YO U HA VE EQ UA L
SPA C ING A C RO SS THE DEC K.
3: FIND TW O 2 X 4 X 30-3/ 4" UPPER LEVEL C ENTER DEC K SUPPO RTS A ND C ENTER THEM O N THE HO LES DRILLED A T
15-1/ 2" UNDERNEA TH THE DEC K BO A RDS. A TTA C H THE DEC K BO A RDS W ITH 2" W O O D SC REW S THRO UG H THE PRE-
DRILLED HO LES.
NO TE: THE TO P O F THE SC REW HEA D SHO ULD BE FLUSH TO THE TO P O F THE DEC K BO A RDS.
STEP 49: UPPER LEVEL DEC K