© 2009 G O RILLA PLA YSETS
STEP 66: LO W ER LEVEL SUNRA Y
1: PLA C E THE REM A INING SUN A SSEM BLY M A DE IN STEP 58 A G A INST THE A NG LED RO O F SUPPO RTS TO THE
O UTSIDE O F THE FO RT, FLUSH TO THE TO P O F THE A NG LED RO O F SUPPO RTS. M A KE SURE THA T THE A SSEM BLY IS
LEVEL BEFO RE PRO C EEDING TO THE NEXT STEP.
2: FA STEN THE SUN A SSEM BLY TO THE FO RT W ITH 2" W O O D SC REW S FRO M THE O UTSIDE INTO THE RO O F SUPPO RTS.
A NG LED RO O F
'BIG SKYE M O DEL II'
FLUSH TO THE
SUPPO RTS
NO T INSTA LLED O N
O UTSIDE O F THE
FA STEN W ITH 2"
W O O D SC REW S
FRO M THIS SIDE
O F THE RO O F
SUPPO RTS