1: FIND THE 4 X 4 X 44-1/ 4" UPPER LEVEL REA R C ENTER PO ST, A ND INSTA LL A T-NUT INTO THE 3/ 8" HO LE A T THE TO P
O F THE PO ST. NO TE THE O RIENTA TIO N O F THE C O UNTER-SUNK HO LE A ND THE T-NUT.
2: PLA C E THE REA R C ENTER PO ST A T THE BA C K O F THE FO RT, A LLO W ING THE HO LE A T THE TO P O F THE PO ST TO
LINE UP W ITH THE HO LE IN THE C ENTER O F THE TO P PA NEL BO A RD. A TTA C H THE REA R C ENTER PO ST TO THE TO P
PA NEL BO A RD USING A 5/ 16 X 4-1/ 2" HEX BO LT W ITH A 5/ 16" W A SHER.
3: MA KE SURE THA T THE UPPER LEVEL REA R C ENTER PO ST IS SQ UA RE TO THE 4 X 4 UPPER LEVEL DEC K SUPPO RT,
A ND A TTA C H IT THRO UG H THE C O UNTER-SUNK HO LE USING A 3/ 8 X 5" LA G SC REW W ITH A 3/ 8" W A SHER. NO TE
THA T THIS STEP W ILL USE THE LA RG ER 3/ 8" HA RDW A RE.
STEP 44: UPPER LEVEL REA R C ENTER PO ST
© 2009 G O RILLA PLA YSETS
HO LE A ND THE T-NUT
C ENTER PO ST
UPPER LEVEL REA R
4 X 4 X 44-1/ 4"
NO TE THE LO C A TIO N
O F THE C O UNTER-SUNK
T-NUT
5/ 16 X 4-1/ 2"
3/ 8" W A SHER
HEX BO LT
5/ 16" W A SHER
3/ 8 X 5"
LA G SC REW