STEP 59: UPPER LEVEL SUNRA Y
1: PLA C E THE A SSEM BLY M A DE IN THE PREVIO US STEP A G A INST THE A NG LED RO O F SUPPO RTS TO THE O UTSIDE O F
THE FO RT, FLUSH TO THE TO P O F THE A NG LED RO O F SUPPO RTS. M A KE SURE THA T THE A SSEM BLY IS LEVEL BEFO RE
PRO C EEDING TO THE NEXT STEP.
2: FA STEN THE SUN A SSEM BLY TO THE FO RT W ITH 2" W O O D SC REW S FRO M THE O UTSIDE INTO THE RO O F SUPPO RTS.
© 2009 G O RILLA PLA YSETS
A NG LED RO O F
SUPPO RTS
'BIG SKYE M O DEL II'
NO T INSTA LLED O N
O UTSIDE O F THE
FLUSH TO THE
FA STEN W ITH 2"
W O O D SC REW S
FRO M THIS SIDE
O F THE RO O F
SUPPO RTS