© 2009 G O RILLA PLA YSETS
5/ 4 X 2-5/ 8 X 42"
SUN SUPPO RT
FA STEN 2" W O O D SC REW S
FRO M THIS SIDE
STEP 58: SUNBURST
2: PLA C E THE 2 X 6 X 16" SUN C ENTERED A G A INST THE 5/ 4 X 2-5/ 8 X 42" SUN SUPPO RT. FA STEN THE SUN TO THE SUN
SUPPO RT W ITH 2" W O O D SC REW S. REPEA T THIS PRO C ESS TW O M O RE TIM ES. W HEN YO U A RE FINISHED, YO U
SHO ULD HA VE THREE A SSEM BLIES SIM ILA R TO THE O NE SHO W N BELO W .
3: PRE-DRILL HO LES IN EA C H END O F THE THREE 5/ 4 X 2 X 16" LA RG E RA YS, A ND THE EIG HTEEN 5/ 4 X 2 X 10" SM A LL
RA YS TO THE PA TTERN SHO W N BELO W .
1: PRE-DRILL HO LES IN THE THREE 2 X 6 X 16" SUNS TO THE PA TTERN SHO W N BELO W .
2 X 6 X 16"
SUN
4"
4"
1"
3
"
4
1
8
"