
STEP 18: CENTER POST FRONT/REAR
1: HAMMER A T-NUT INTO THE HOLE OF EACH 2 X 4 X 28-9/16" CENTER POST FRONT/REAR.
2: PLACE THE CENTER POST INSIDE THE RAILINGS AT THE FRONT AND REAR OF THE
PLAYSET. LINE UP THE HOLES IN THE CENTER POSTS WITH THE HOLES IN THE RAILINGS.
3: FASTEN THE CENTER POSTS TO THE RAILINGS WITH 5/16" X 2-1/2" HEX BOLTS AND 5/16"
WASHERS AT THE TOP.
4: SQUARE EACH CENTER POST TO THE DECK AND SECURE THE BOTTOM OF THE CENTER
POST TO THE BOTTOM PANEL BOARDS WITH #8 X 2-1/2" WOOD SCREWS.
5/16" T-NUT
CENTER POST FRONT/REAR
BOTTOM PANEL BOARD
2 X 4 X 28-9/16"
DETAIL A
SCALE 1 : 8
RAILING
HEX BOLT
5/16" WASHER
5/16" X 2-1/2"
#8 X 2-1/2"
WOOD SCREWS
RAILINGS
CENTER POSTS
2 X 4 X 28-9/16"
BOTTOM PANEL
BOARDS
A
Summary of Contents for 1500CWR
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 9: ...Model 1500CWR BOXES 1501 1512 1528 1529 Extreme Tube Slide Box X1 120 Slide Box REV 3 26 2015 ...
Page 21: ...MAXIMUM SWING BEAM LOAD IS 425 LBS ...
Page 43: ...EXTREME TUBE SLIDE 03 0014 1 PICTURE DESCRIPTION QTY ...
Page 110: ...APPENDIX ...