
Safety Guidelines……………………………………….......……...........................Pages 3-6
Le eling Fort General Information and De nitions
...................Pages 8
Ho to Install T nuts Board Identi cation Predrill Lag Scre Directions and
Swing Beam Loading........................................................................................Pages 9-13
Site Plan, Required Tool List and Kit Contents...............................................Pages 14-15
Hard are Lum er and Accessory Chec lists
........Pages 1 35
Adding T-Nuts to Corner Posts...…………………………………..………...…........... Step 1
Framing Fort……………………………………..…………………………..……..... Steps 2-9
Mounting Dec
....
.
... ................... Step 10
Roc Wall Assem ly/Installation
... ..
..
... .
.... Steps 11 15
Ladder Assem ly/Installation
..
........................................... Steps 1 17
Center Post and Panel Slat Installation.......................................................... Steps 18-19
S ing Beam Assem ly
.
..
........ .............. Steps 20 27
Roof Assembly...................................……...……………………….………...... Steps 28-33
Front Gable Assembly and Installation........................................................... Steps 34-35
Front Wall Assem ly and Completion of Main Roof....................................... Steps 3 40
Hanging Swings and Safety Board…………………………………………….... Steps 41-42
Picnic Ta le Assem ly and Installation..
...... . ....... Steps 43 45
Rope Ladder Assem ly/Installation
.....
......... ....... Step 4
E treme Tu e Slide Side Panel Slats Right Side Angle Supports ...
.. Steps 47 48
Slide Roc Wall Rope Safety Handles and Telescope................................. Steps 4 52
Tic Tac Toe Assem ly/Installation
..
............... Steps 53 54
Sand o Seats/Name Plate Solar Wall Lights and Steering Wheel.............. Steps 55 57
Ground Sta es....................................................................................................... Step 58
Leftover Parts List............................................................................................... Page 101
Appendi : Chimney and Dormer Instructions etc.............................................. Page 102
PLEASE READ OWNER’S MANUAL CAREFULLYBEFORE STARTING ASSEMBLY!
TABLE OF CONTENTS
Summary of Contents for 1500CWR
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 9: ...Model 1500CWR BOXES 1501 1512 1528 1529 Extreme Tube Slide Box X1 120 Slide Box REV 3 26 2015 ...
Page 21: ...MAXIMUM SWING BEAM LOAD IS 425 LBS ...
Page 43: ...EXTREME TUBE SLIDE 03 0014 1 PICTURE DESCRIPTION QTY ...
Page 110: ...APPENDIX ...