![GMP AirStream 89299 Operation And Maintenance Download Page 23](http://html1.mh-extra.com/html/gmp/airstream-89299/airstream-89299_operation-and-maintenance_2236379023.webp)
Page 23
remove the belt guides
loosen and remove the tension nuts
loosen the tension screws
remove the idler pulleys and the belts
Place the new belt in position on the drive pulley, place the idler pulley around the other end and replace the
idler pulley onto the tensioning shaft. Replace the tension nut and then tension as described in section 13.0.
NOTE: NEVER POWER THE MACHINE UP OR RUN WITH THE GUARDS RE-
MOVED. DOING SO MAY RESULT IN INJURY TO THE OPERATOR.