![Glowworm GC 41 319 08 Installation And Servicing Instructions Download Page 25](http://html1.mh-extra.com/html/glowworm/gc-41-319-08/gc-41-319-08_installation-and-servicing-instructions_2234643025.webp)
25
221051B
25
SECTION
6
Installation
s t e p
12
s t e p
13
2902
TOP
MOUNTING
BRACKET
BOTTOM
MOUNTING
BRACKET
When the boiler is correctly located
secure it with the two screws.
Note: To reduce the total lifting
weight remove the electrical control
box and combustion chamber
assembly by following the
instructions in Section 6, step 18 and
Section 10, steps 3,5,6,7,8 and 9.
Lift the boiler into position above the
top mounting bracket, allow the boiler
to slide down the wall onto the top
and bottom wall mounting brackets.
Check the engagement by pulling the
boiler forward at its base, there should
be no forward movement.