![Glowworm GC 41 319 08 Installation And Servicing Instructions Download Page 21](http://html1.mh-extra.com/html/glowworm/gc-41-319-08/gc-41-319-08_installation-and-servicing-instructions_2234643021.webp)
21
221051B
21
SECTION
6
Installation
s t e p
s t e p
1
2
2898
s t e p
4
s t e p
8
s t e p
17
s t e p
21
s t e p
9
s t e p
21
t o
t o
&
t o
Boiler Preparation
Remove the front panel and place it
on one side until required.
WHEN FITTING A REAR FLUE
FOLLOW STEPS
WHEN FITTING A SIDE FLUE
FOLLOW STEPS
Remove the inner case by releasing
the screws at the bottom and
unhooking at the top, place on one
side until required.
Remove the violet and red electrical
connections from the fan.
Break the air pressure switch tubes
connections.
Remove the fan/flue hood assembly by
removing the two screws one at each side.
s t e p
3
FRONT
PANEL
INNER
CASE
SCREW (2)
CLEAR
RED
AIR
PRESSURE
SWITCH
TUBES
ELECTRICAL
CONNECTIONS
FAN/FLUE
HOOD
SCREW (2)