16
221051B
16
SECTION
Flue Installation
5
Q
Q+13mm
STANDARD
FLUE TERMINAL
Q
Q+11mm
2893
s t e p
s t e p
4
5
s t e p
11
Continue at
Flue Duct
Mark the duct to the length
“Q”+11mm then cut square and
remove any burrs.
Air Duct/Terminal
Mark the duct to the length
“Q”+13mm then cut square and
remove any burrs.
1M AND 2M FLUE
TERMINAL