Glow-worm Hideaway 100B Instructions For Use Manual Download Page 7

Supplied By www.heating spares.co  Tel. 0161 620 6677

7

221764B

FRONT CLEARANCE

Diagram 1.5

0906

700 (27

1/

in.)

BOILER

WALL OR
FIXTURE

1 General Data

2 Water Systems

Diagram 2.1

0869

27metre
Max.

PUMP

To Heating
Circuit

INDIRECT
CYLINDER

22mm VENT

15mm COLD FEED

REFER TO BS 5546

28mm

Distributor tube in
pumped return
connection

BOILER
    CL

DRAIN OFF
COCK

Diagram 2.2

FULLY PUMPED SYSTEM
(DIAGRAMMATIC)

0870

1 metre
MIN.
27metres
MAX.

PUMP

To Heating
Circuit

TO INDIRECT
CYLINDER

22mm VENT

15mm 
COLD FEED

Distributor tube in
pumped return
connection

BOILER
    CL

DRAIN OFF
COCK

A special top casing, part No. 424820, can be purchased to
enable the boiler casings to be arranged flush with 600mm
(23

5

/

8

in) deep work tops and kitchen units.

Where the installation of the boiler will be in an unusual location,
special procedures are necessary, the current issue of BS6798
gives guidance on this.

A compartment used to enclose the boiler must be designed
and constructed specifically for this purpose. An existing
cupboard or compartment modified for the purpose may be
used.  Details of essential features of cupboard design are given
in the current issue of BS6798.

If the boiler is to be installed in a compartment, make sure that
nothing will obstruct the openings/vents in the compartment.

1.9 Heating System Controls

The heating system should have installed: a programmer and
room thermostat  controlling the boiler.

Thermostatic radiator valves may be installed in addition to the
room thermostat.

2.1 Water Pressure Head

This boiler shall only be connected to a cistern supply, with a
minimum head of 1 metre (3ft) and a maximum of 27 metres
(90ft) and having an open vent in the system.

The boiler must not be connected to a sealed water system.

2.2 Inhibitor

Attention is drawn to the current issue of BS5449 and BS7593
on the use of inhibitors in central heating systems.

If an inhibitor is to be used in the system, contact should be
made with an inhibitor manufacturer so they can recommended
their most suitable product.

When using in an existing system take special care to drain the
entire system, including the radiators, then thoroughly cleaning
out before fitting the boiler, whether or not adding an inhibitor.

2.3 Gravity Domestic and Pumped Heating

It is recommended that a cylinder thermostat is used to prevent
the stored water temperature becoming unnecessarily high.

The primary flow and return must be 28mm.               The
installation must comply with the current issue of BS5546 and
BS6700, see diagram 2.1.

If the above conditions cannot be met, it is suggested that a fully
pumped system be used.

Fully Pumped System

Where a single pumped, flow and return is taken from the boiler,
refer to diagram 2.2.

2.5 Circulation Pump

The pump should be set to give a temperature difference of
11

o

C (20

o

F) across the system.  At the appropriate flow rate the

resistance through the boiler can be found from the pressure
loss graph, diagram 2.3.

If possible use a pump with integral valves, if not fit valves as
close as possible each side of the pump.

Note: If the pump is to be fitted inside the boiler casing a heat
shield kit is required.  Kit No. 425839.

Note: For further information, see The Building Regulations
1991 - Conservation of fuel and power, 1995 edition - Appendix
G, table 4b.

Summary of Contents for Hideaway 100B

Page 1: ...the Heatcall Customer Service number 01773 828100 Our Guarantee gives you peace of mind plus valuable protection against breakdown by covering the cost of Guarantee Registration Balanced Flue Boiler...

Page 2: ...certifiedby Notified body 0086 The CE mark on this appliance shows compliance with 1 Directive 90 396 EEC on the approximation of the laws of the Member States relating to appliances burning gaseous f...

Page 3: ...obtain service please call your installer or Heatcall Glow worm s own service organisation using the telephone number given on the front panel Please be advised that the Benchmark logbook should be co...

Page 4: ...To Turn the Boiler Off For short periods turn the boiler thermostat control knob B anticlockwise to O The pilot will stay alight To relight the main burner turn thermostat control knob B clockwise to...

Page 5: ...millimetres except as noted The Seasonal Efficiency Domestic Boilers UK SEDBUK is 73 0 ThevalueisusedintheUKGovernment sStandardAssessment Procedure SAP for energy rating of dwellings The test data f...

Page 6: ...ast 0 75mm2 24 0 20mm to BS6500 Table 16 must be used for all connections within the boiler casing 1 8 Boiler Location This boiler is not suitable for outside installation The boiler may be installed...

Page 7: ...be connected to a cistern supply with a minimum head of 1 metre 3ft and a maximum of 27 metres 90ft and having an open vent in the system The boiler must not be connected to a sealed water system 2 2...

Page 8: ...plasticguttering or within 450mm 18in of painted eaves or gutter an aluminium shield 1 5 metres 5ft long should be fitted to the underside and immediately beneath the guttering The air inlet products...

Page 9: ...accordance with the Compartment Air Vent Table Boththehighlevelandthelowlevelairventsmustcommunicate with the same room or must both be on the same wall to outside air Before fixing the boiler make s...

Page 10: ...loose items pack see diagram 4 5 4 6 Pump Within Boiler Casing If the pump is to be fitted inside the boiler casing see diagram 6 2 ensure that a heat shield kit is obtained and fitted Kit No 425839...

Page 11: ...tioned with the balanced flue duct sticking out into the prepared hole in the wall and pipework connected make good to the inside of the wall face around the boiler flue assembly 4 8 Balanced Flue Ter...

Page 12: ...ent grille is supplied with the boiler and can be fitted at the rear of the left or right hand side casing The grille is fitted on the opposite side to any pipework connections If required fit the gri...

Page 13: ...AX MIN MID MAX SIDE CASING L H MAX MID MIN MIN BOILER PLINTH FRONT CASING BRACKET MID No 8 SCREW 4 UPPER CASING BRACKET LOCATING LUG AND SLOTS 0886 5 3 Top Casing The top casing can be fitted in four...

Page 14: ...the cable does not touch any hot surfaces 6 2 Pump Cable Connection Heat resistant cable as above must be used if the pump is to be fitted inside the casing SupportthecableinasimilarmannertoControlBo...

Page 15: ...alight repeat the lighting procedure only now keep the control knob pushed for a little longer If the gas control knob A is turned to a safety lock prevents it being turned on again until 3 minutes ha...

Page 16: ...ration screw Relight the main burner and check for gas soundness with a suitable leak detection fluid 7 4 Completion and User Information Instruct and demonstrate the efficient and safe operation of t...

Page 17: ...e and burners to be withdrawn forwards Remove graphite coated nut to release baffle tray and remove from combustion chamber taking care not or damage the insulation material in the sides of the chambe...

Page 18: ...Section 8 1 Disconnect the gas valve plug thermocouple nut and pilot tube connections at the gas valve see diagram 9 1 Support the valve and remove the four right hand flange screws to disconnect the...

Page 19: ...Thermostat Follow the relevant instructions in Section 8 1 Remove the mains inlet connector by pulling downwards see diagram 8 1 Remove the retaining split pin from the phial pocket then withdraw the...

Page 20: ...ntrol box and unhooking at the bottom see diagram 9 4 Pull the ignition lead off piezo unit see diagram 9 4 When refitting control box make sure the thermostat capillary is positioned so that it passe...

Page 21: ...N in inlet connector and gas valve plug terminal N Is there continuity Disconnect ohmmeter and reconnect gas valve plug Restore power to unit Does burner light Boiler in order Isolate electricity sup...

Page 22: ...re the OPEN CIRCUIT voltage Is voltage greater than 15mV Faulty thermocouple Replace Note the open circuit reading then measure the CLOSED CIRCUIT voltage Note this voltage Referring to the diagnosis...

Page 23: ...ACTORY Does pilot flame envelop thermocouple Check aeration If necessary Clean pilot rectify blockage in pilot injector or replace Check thermocouple circuit using Thermocouple and Boiler Overheat Cut...

Page 24: ...British Gas also quote the GC number of the part and appliance 9014 3 5 8 9 10 4 7 6 12 1 2 11 Diagram 11 1 Key No Part No Description GC No 1 203377 Gas control valve 394 151 2 205748 Injector 2 3 2...

Reviews: