Glow-worm Hideaway 100B Instructions For Use Manual Download Page 5

Supplied By www.heating spares.co  Tel. 0161 620 6677

5

221764B

General Data

A

B

C

D

E

F

G

H

J

K

L

M

N

P

mm

474

214

558

294

359

533

3

300

445

121

156

664

398

398

in.

18

11

/

16

8

1

/

2

22

11

1

/

2

14

1

/

8

21

1

/

8

11

3

/

4

17

1

/

2

4

3

/

4

6

1

/

8

26

1

/

8

15

5

/

8

15

5

/

8

RANGE RATING

NOMINAL

kW

HEAT INPUT
(GROSS)

Btu/h

33.18

35.00

36.78

113,200 119,500 125,500

min

medium

max

BURNER

mbar

SETTING
PRESSURE

in.w.g

(HOT)

9.3

10.5

11.7

3.7

4.2

4.7

NOMINAL

kW

HEAT
OUTPUT

Btu/h

26.38

27.84

29.31

90,000

95,000 100,000

205748

INJECTOR

GENERAL DIMENSIONS - given in millimetres (Approx. inches)

Diagram 1.1

1071

✽ 

Refer to BOILER CASING

    HEIGHT diagram

M

D

C

C

L

✝ 

A SPECIAL TOP CASING

  TO SUIT 600mm (23

5/

in.)

  WORKTOPS IS AVAILABLE

WATER CONNECTIONS

    Rc1 (1in. B.S.P.T.)

WATER CONNECTIONS Rc1 reduced
with DISTRIBUTOR TUBE to
Rc 

3/

4

 (

3/

4

 in. B.S.P.T.) (pumped return)

GAS CONNECTION

   Rc 

1/

2

 (

1/

2

 in. B.S.P.T.)

✝ 

F(MIN.)

L

H

A

L

C

B

N

P

C

L

E

J

K

G(MIN.)

G(MIN.)

Important Notice

This boiler is for use only on G20 gas.

Wherever possible, all materials, appliances and components
used shall comply with the requirements of applicable British
Standards.

Where no British Standard exists, materials and equipment
should be fit for their purpose and of suitable quality and
workmanship.

1.1 Data

Weight of boiler 147.0kg (324lb)

Water content

11.7litre (2.57gall)

Gas connection

Rc1/2 

1

/

2

inBSP

Water connection

Rc1 1 in BSP

Electrical supply 230V ~ 50Hz fused 3A

Burner

Aeromatic (2 off)

All dimensions are given in millimetres, except as noted.

The Seasonal Efficiency Domestic Boilers UK (SEDBUK)
is 73.0%.

The value is used in the UK Government’s Standard Assessment
Procedure (SAP)  for energy rating of dwellings.  The test data
from which it has been calculated have been certified by B.S.I.

1.2 Range Rating

This boiler is range rated and may be adjusted to suit individual
system requirements.

The Tables give the appropriate settings and ratings.

The boiler heat input is factory preset to its maximum rating.
This should be adjusted to suit individual system requirements.

The arrow indicator, from the loose items pack, should be stuck
on the data label to indicate the setting.

1.3 Sheet Metal Parts

WARNING.  When installing or servicing this boiler, care should
be taken to avoid any possibility of personal injury when
handling sheet metal parts.

1.4 Statutory Requirements

The installation of this boiler must be carried out by a competent
person in accordance with the relevant requirements of the
current issue of:

Manufacturer’s instructions, supplied.

The Gas Safety (Installation and Use) Regulations,  The Building
Regulations, The Bye-laws of the Local Water Company, The
Building Standards (Scotland) Regulations, (applicable in
Scotland), The Health and Safety at Work Act, Control of
Substances Hazardous to Health, Electricity at Work Regulations
and any applicable local regulations.

Detailed recommendations are contained in the current issue of
the following British Standards and Codes of Practice:

BS6798, BS5440 Part 1 and 2, BS5546, BS5449 Part 1,
BS6700, BS6891, BS7478, BS7593, BS7671.

Manufacturers instructions must in not be taken as overriding
statutory requirements.

Summary of Contents for Hideaway 100B

Page 1: ...the Heatcall Customer Service number 01773 828100 Our Guarantee gives you peace of mind plus valuable protection against breakdown by covering the cost of Guarantee Registration Balanced Flue Boiler...

Page 2: ...certifiedby Notified body 0086 The CE mark on this appliance shows compliance with 1 Directive 90 396 EEC on the approximation of the laws of the Member States relating to appliances burning gaseous f...

Page 3: ...obtain service please call your installer or Heatcall Glow worm s own service organisation using the telephone number given on the front panel Please be advised that the Benchmark logbook should be co...

Page 4: ...To Turn the Boiler Off For short periods turn the boiler thermostat control knob B anticlockwise to O The pilot will stay alight To relight the main burner turn thermostat control knob B clockwise to...

Page 5: ...millimetres except as noted The Seasonal Efficiency Domestic Boilers UK SEDBUK is 73 0 ThevalueisusedintheUKGovernment sStandardAssessment Procedure SAP for energy rating of dwellings The test data f...

Page 6: ...ast 0 75mm2 24 0 20mm to BS6500 Table 16 must be used for all connections within the boiler casing 1 8 Boiler Location This boiler is not suitable for outside installation The boiler may be installed...

Page 7: ...be connected to a cistern supply with a minimum head of 1 metre 3ft and a maximum of 27 metres 90ft and having an open vent in the system The boiler must not be connected to a sealed water system 2 2...

Page 8: ...plasticguttering or within 450mm 18in of painted eaves or gutter an aluminium shield 1 5 metres 5ft long should be fitted to the underside and immediately beneath the guttering The air inlet products...

Page 9: ...accordance with the Compartment Air Vent Table Boththehighlevelandthelowlevelairventsmustcommunicate with the same room or must both be on the same wall to outside air Before fixing the boiler make s...

Page 10: ...loose items pack see diagram 4 5 4 6 Pump Within Boiler Casing If the pump is to be fitted inside the boiler casing see diagram 6 2 ensure that a heat shield kit is obtained and fitted Kit No 425839...

Page 11: ...tioned with the balanced flue duct sticking out into the prepared hole in the wall and pipework connected make good to the inside of the wall face around the boiler flue assembly 4 8 Balanced Flue Ter...

Page 12: ...ent grille is supplied with the boiler and can be fitted at the rear of the left or right hand side casing The grille is fitted on the opposite side to any pipework connections If required fit the gri...

Page 13: ...AX MIN MID MAX SIDE CASING L H MAX MID MIN MIN BOILER PLINTH FRONT CASING BRACKET MID No 8 SCREW 4 UPPER CASING BRACKET LOCATING LUG AND SLOTS 0886 5 3 Top Casing The top casing can be fitted in four...

Page 14: ...the cable does not touch any hot surfaces 6 2 Pump Cable Connection Heat resistant cable as above must be used if the pump is to be fitted inside the casing SupportthecableinasimilarmannertoControlBo...

Page 15: ...alight repeat the lighting procedure only now keep the control knob pushed for a little longer If the gas control knob A is turned to a safety lock prevents it being turned on again until 3 minutes ha...

Page 16: ...ration screw Relight the main burner and check for gas soundness with a suitable leak detection fluid 7 4 Completion and User Information Instruct and demonstrate the efficient and safe operation of t...

Page 17: ...e and burners to be withdrawn forwards Remove graphite coated nut to release baffle tray and remove from combustion chamber taking care not or damage the insulation material in the sides of the chambe...

Page 18: ...Section 8 1 Disconnect the gas valve plug thermocouple nut and pilot tube connections at the gas valve see diagram 9 1 Support the valve and remove the four right hand flange screws to disconnect the...

Page 19: ...Thermostat Follow the relevant instructions in Section 8 1 Remove the mains inlet connector by pulling downwards see diagram 8 1 Remove the retaining split pin from the phial pocket then withdraw the...

Page 20: ...ntrol box and unhooking at the bottom see diagram 9 4 Pull the ignition lead off piezo unit see diagram 9 4 When refitting control box make sure the thermostat capillary is positioned so that it passe...

Page 21: ...N in inlet connector and gas valve plug terminal N Is there continuity Disconnect ohmmeter and reconnect gas valve plug Restore power to unit Does burner light Boiler in order Isolate electricity sup...

Page 22: ...re the OPEN CIRCUIT voltage Is voltage greater than 15mV Faulty thermocouple Replace Note the open circuit reading then measure the CLOSED CIRCUIT voltage Note this voltage Referring to the diagnosis...

Page 23: ...ACTORY Does pilot flame envelop thermocouple Check aeration If necessary Clean pilot rectify blockage in pilot injector or replace Check thermocouple circuit using Thermocouple and Boiler Overheat Cut...

Page 24: ...British Gas also quote the GC number of the part and appliance 9014 3 5 8 9 10 4 7 6 12 1 2 11 Diagram 11 1 Key No Part No Description GC No 1 203377 Gas control valve 394 151 2 205748 Injector 2 3 2...

Reviews: