GFS NETLIGHT Quattro Manual Download Page 41

system documentation quattro GB V13.docx / Page 41 

F

 

7.7 User manual 

 
 

Date + time 

 

 

 
 

 

 

 
 

Set timer  

 

 

 
 

 

 

Select the timer 1,2,3 or 4 

  Switch-on/switch off- deactivated 

 

 - once – period – weekly or monthly 

 

 

 

 
 

 

 

Select OC/SC/Equipment-/Lights-/ 

 

Battery test or not used 

 

* Deactivate timer, in order to completely delete a timer, the option "not used" must be selected here. 

 

 
 

Calibrate circuit 

 

 
 

 

 

 
 

 

1x 

 

OK 

TIMER 

 No.  X 

 tt.mm.yyyy hh:mm 
  

USER MANUAL 

 Date + time  

 Set Timer 
 Calibr. circuit 

 

TIMER - CONFIG 

 No.  1 

   Switch ON 
  

 TIMER - CONFIG 
  No.  X   

period

 

           

once

 

   

 

OK 

 

OK 

◄ 

◄ 

◄ 

 

OK 

 

▬ 

 

▬ 

 

▬ 

 

DATE + TIME 

 Date:  tt.mm.yyyy 

 Time: hh:mm 

  

USER MANUAL 

 Date + time  

 Set Timer 

 Calibr. circuit 

 

 

OK 

 

 Save . . . 

  

  

◄ 

◄ 

 

OK 

 

▬ 

 

TIMER - CONFIG 

 No.  X   Weekdays 

  MoTuWeThFrSaSu 
  . . X . . . . 

TIMER - CONFIG 

 No.  X   time 

 

 ON:     hh:mm 
  

TIMER – CONFIG*  

 No.  X  Release SET-UP  

   Lights test 
  

  

  Save . . .  

            
   

 

OK 

◄ 

◄ 

 

OK 

◄ 

 

▬ 

 

▬ 

 

▬ 

 

 

OK 

 

2x 

 

 calibrate . . .  

  

  

USER MANUAL 

 Date + time  

 Set Timer 

 Calibr. circuit 

 

◄ 

 

 

OK 

Summary of Contents for NETLIGHT Quattro

Page 1: ...ption operating notes data Page 19 24 Principle circuit diagrams Page 25 33 Commissioning Page 34 35 Operating instructions Page 36 53 Manufacturer notes Page 54 Appendix 1 Possible fault indications...

Page 2: ...system documentation quattro GB V13 docx Page 2...

Page 3: ...system documentation quattro GB V13 docx Page 3...

Page 4: ...system documentation quattro GB V13 docx Page 4...

Page 5: ...LATION 11 3 1 INSTRUCTIONS 11 3 2 INSTALLATION PREPARATION 11 3 3 OPENING CLOSING THE DEVICE 12 3 4 WALL MOUNTING 13 3 5 EXPANSION HOUSING 14 3 6 CABLE ENTRY FUSES 15 3 7 CONNECTION COMPARTMENT 16 3 8...

Page 6: ...BEFORE COMMISSIONING 34 6 2 COMMISSIONING 34 6 2 1 NOTES ON VOLTAGE MEASUREMENTS 34 6 2 2 CONNECTION OF THE MAINS SUPPLY LINE 34 6 2 3 CONNECTING THE MAINS SUPPLY AND MONITORING THE SYSTEM STARTUP 34...

Page 7: ...y must be observed Only luminaires with electronic ballasts that correspond to the respective operating voltages specified in the data sheet may be used on the final circuits of the system The nominal...

Page 8: ...system or parts of it 1 4 Intended use The central power supply system is only suitable for use in safety lighting systems It is used to monitor and control the safety lighting system with general lig...

Page 9: ...ot necessary to defer a test after power failure Test operations are blocked in case of battery undervoltage and emergency operation The automatic test of the total measurement duration of the system...

Page 10: ...of 5 to 40 C at most Condensation must be excluded If batteries are supplied with the system they must also be stored in a clean dry place The ambient temperature should be between 0 and 25 C It must...

Page 11: ...a technically faultless condition and only for the intended purpose The safety instructions in the manual as well as the operator s instructions must be observed For the safe operation of the install...

Page 12: ...ide view Dome pins for fixing the housing cover when closing make sure that the pins are seated correctly in their uptakes When closing the hood first place it at an angle with the upper dome pins and...

Page 13: ...4x 12V 26Ah 52Ah approx 48 kg incl 1x expansion housing 350VA 3h 2x 12V 65Ah approx 61 kg incl 1x expansion housing 88VA 8h 4x 12V 18Ah 36Ah approx 35 kg 188VA 8h 2x 12V 65Ah approx 61 kg incl 1x expa...

Page 14: ...ttom left and right Close The inverted order of open Open 3 Finally pull the housing away from the front and down Open 1 The quattro housing must be open then remove the screw at the top bottom of the...

Page 15: ...e pre perforated round entries can be broken out to insert the cables Fuses F1 4 circuits 1 4 6 3x32 T 1 6A F5 mains fuse 6 3x32 T 6 3A For trouble free operation we recommend for the cable entry of t...

Page 16: ...inal circuits L N PE Colour grey blue light green 230V 50Hz from mains or inverter per circuit fuse protection 6 3x32 T1 6A per circuit max 200VA Total power of circuits 1 to 4 max 350VA X2 signalling...

Page 17: ...ith DIN VDE 0510 Part 2 and read the battery manufacturer s data sheets Before connecting the battery make sure to compare the set values for trickle charge and boost charge of the charger with the va...

Page 18: ...SBL battery series 3 10 Installation completion tasks Make sure that the system is free of dust and that no tools are left behind after installation Loose parts and tools lying around are sources of...

Page 19: ...g Expansion housing H 250mm W 410mm D 205mm 1 Fuses 2 Cable entry 3 USB network connection 4 Fixing holes keyhole 12 7 mm 5 Connection compartment 6 Base board 7 Display and control panel 8 Charging u...

Page 20: ...lready integrated Cable entry via membrane gland plate Wall mounting Distance hole 7mm to top edge of roof 30mm Hole centre 359mm HxWxD approx 1000x500x250mm 1 Fuses 2 Cable entry 3 USB network connec...

Page 21: ...tus LEDs 4 line display Back with the Left arrow key or press the menu key again Whenever this symbol appears you can switch back one level by pressing the Left arrow key Whenever this symbol appears...

Page 22: ...be operated as if it were operated directly on the device All screens of the master display are also displayed on the PC screen in real time On the other screens the status states measured values from...

Page 23: ...0 C to 40 C Housing material Supporting elements galvanised sheet steel Hood plastic UL94 HB Colour middle section ABS 24 Alu brushed Colour side panels PS 36 brilliant blue RAL 5007 Cable entry from...

Page 24: ...igation keypad Operating notes Symbol in the operating instructions for Arrow up Arrow left back Arrow right Arrow down Values must be set in the display Select in the display Confirm Menu Menu OK Arr...

Page 25: ...uit diagrams terminal diagram 5 1 1 Circuit diagram 230V final circuits 1 4 inputs 1 4 LAN USB r 6 3 Fuse types Art 112153 micro fuse 5x20 2 5A slow Art 112382 micro fuse 6 3x32 1 6A slow Art 112333 m...

Page 26: ...system documentation quattro GB V13 docx Page 26 5 1 2 Circuit diagram Messages inputs E5 9 panel module BUS...

Page 27: ...system documentation quattro GB V13 docx Page 27 5 2 1 Terminal diagram X2 X4 X5...

Page 28: ...system documentation quattro GB V13 docx Page 28 5 2 2 Terminal diagram X6 X8 X9...

Page 29: ...system documentation quattro GB V13 docx Page 29 5 3 Mains connection panel connection...

Page 30: ...system documentation quattro GB V13 docx Page 30 5 4 Three phase monitoring X0...

Page 31: ...system documentation quattro GB V13 docx Page 31 5 5 Digital inputs 1 4 230V AC...

Page 32: ...system documentation quattro GB V13 docx Page 32 5 6 Network monitoring loop digital inputs 5 8 for pot free contacts...

Page 33: ...d by means of the Netlight ProVisu software on the network panel The cables and cable lengths normally used for networks apply here For the connection cables we recommend to use CAT7 cables for connec...

Page 34: ...a 6 2 2 Connection of the mains supply line Before connecting the supply lines the value of the mains voltage must be measured and compared with the data on the nameplate After the measurement disconn...

Page 35: ...h off the system via the operating and display element see Section 7 7 User menu Switch off please wait until the LEDs extinguish Remove the hood as described in section 5 6 Remove the plus or minus c...

Page 36: ...splay element 7 1 Menu overview Switching operation System ON OFF Standby Continuous ON OFF Activate test Light test Battery test Device test Menu Programming User Service Installer Information Networ...

Page 37: ...ns OK tt mm yyyy hh mm Menu INFORMATION Customer service Softwareversion Network OK QUATTRO SOFTWAREVER Display X X Board X X Charger X X OK 1x Information Switching action Activate test Programming O...

Page 38: ...OC OFF SC ON OK 1x OK 1x Information Switching action Activate test Programming OPERATION Mains OK Spare mains OK tt mm yyyy hh mm Menu SWITCHING ACTION System OFF OC OFF SC ON OK 1x OK 2x Information...

Page 39: ...on The Equipment test and Battery test are activated manually in the same way as the lights test Information Switching action Activate test Programming OPERATION Mains OK Spare mains OK tt mm yyyy hh...

Page 40: ...ps is 0000 Information Switching action Activate test Programming OPERATION Mains OK Spare mains OK tt mm yyyy hh mm Menu PROGRAMMING User Electrician Service 3x USER MANUAL PASSWORD XXXX OK OK OK Pro...

Page 41: ...tion not used must be selected here Calibrate circuit 1x OK TIMER No X tt mm yyyy hh mm USER MANUAL Date time Set Timer Calibr circuit TIMER CONFIG No 1 Switch ON TIMER CONFIG No X period once OK OK O...

Page 42: ...MANUAL Set Timer Calibr circuit Setups LIGHTS Light log on off Lights text Lights scan CIRCUIT SELECTION Circuit X Ci0X OK OK OK OK OK NEW PROGRAMMING Save yes no LIGHT LOG ON OFF 1 M 10 11 20 Ci0X Sa...

Page 43: ...om power Switch on again according to point 6 Commissioning Restart save no back to user manual PASSWORD old XXXX new XXXX USER MANUAL Calibr circuit Setups Password New Password accepted USER MANUAL...

Page 44: ...he next window select next circuit or press back or the menu key SETUPS Lights Circuit Input INSTALLATION MENU Setups Collective fault Charge management CIRCUIT Circuit type Circuit text Current toler...

Page 45: ...arge management CIRCUIT Circuit type Circuit text Current tolerance CIRCUIT SELECTION Circuit X Ci0X OK OK 1x OK OK 2x NEW PROGRAMMING Save yes no CURRENT TOLERANCE Circuit X 20 Save CIRCUIT SELECTION...

Page 46: ...e management INPUTS PROPERTY Switch function Inputs text INPUT SELECTION Input X Input X OK 2x OK OK OK 2x NEW PROGRAMMING Save yes no DESCRIPTION Input X Your input text Save INPUT SELECTION Input X...

Page 47: ...witch back time UNDERVOLTAGE 197 V OK 3x OK OK OK NEW PROGRAMMING Save yes no Save PHASE MONITOR Undervoltage Hysteresis Switch back time OK OK SETUPS Circuit Inputs Phase monitor INSTALLATION MENU Se...

Page 48: ...or the menu key Setups Loop monitoring The name of the loop monitoring can be changed by using a USB keyboard To do this connect a standard USB keyboard to the USB port on the top SETUPS Circuit Inpu...

Page 49: ...MANAGEMENT Battery selection Initialize charger Batt Circ Monit INSTALLATION MENU Setups Collective fault Charge management BATTERY SELECTION 17Ah 1hour 200W 24Ah 1hour 280W 34Ah 3hour 180W NEW PROGR...

Page 50: ...ement Test Time INSTALLATION MENU Collective fault Charge management Test Time OK OK 3x PROGRAMMING LPS is programmed INSTALLATION MENU Charge management Test Time LPS programming INSTALLATION MENU Ch...

Page 51: ...loading the configuration the LPS will be programmed automatically Without USB stick the following message appears Save INSTALLATION MENU LPS programming Password Save Config INSTALLATION MENU LPS pro...

Page 52: ...he case of static selection the corresponding data IP network mask gateway must be entered manually via the MENU item Address see the next page DN Programming Add Remove INSTALLATION MENU Save Config...

Page 53: ...rrent is determined correct current value end with the left arrow The current is measured using a pair of current clamps to measure the current on the plus or minus line and compare it with the left v...

Page 54: ...ion 7 7 Then remove the CAT cable at the display A2 connector X1 The battery G2 is located on the upper right hand side of the display panel Use plastic tweezers pin to push the battery up from below...

Page 55: ...shes and fault lights up Output circuit fuse on the circuit module defective Check connected Lights for short circuits Lights missing e g Ci01 L01 Lights defective Incorrectly coded module Module defe...

Page 56: ...system documentation quattro GB V13 docx Page 56...

Page 57: ...system documentation quattro GB V13 docx Page 57 Free for Test Report...

Page 58: ...system documentation quattro GB V13 docx Page 58 Free for Test Report...

Reviews: