![GFS NETLIGHT Quattro Manual Download Page 10](http://html1.mh-extra.com/html/gfs/netlight-quattro/netlight-quattro_manual_2219693010.webp)
system documentation quattro GB V13.docx / Page 10
2.
System delivery, storage
2.1 Packaging inspection
Upon receipt the goods must be checked to ensure they are intact and complete. If the packaging is damaged, it must immediately be opened. Missing items or damages must
immediately be reported, otherwise all claims against the transport company will lapse. See delivery note for address.
2.2 Damage complaint
Immediately after receipt, check the delivery for completeness and transport damage. Do not accept or accept only under reserve deliveries with visible external transport damage.
2.3 Storage / Battery storage period
The device must not be exposed to building rubble or dusty dirt. The room must be clean and dry. The ambient temperature may vary within a range of -5 to 40°C at most. Condensation
must be excluded.
If batteries are supplied with the system, they must also be stored in a clean, dry place. The ambient temperature should be between 0 and 25°C. It must be ensured that the batteries
are charged after 6 months at the latest or when the open-circuit voltage drops below 2.08V/Z.
The warranty expires in case of improper or too long storage.
2.4 Upright transport
The systems/devices/distributors should always be transported in an upright position unless otherwise described on the packaging. Use only suitable accessories for transport and make
sure no one is at risk.
2.5 Packaging disposal/packaging
Packaging should be separated according to type and size of materials.
Environmentally sound disposal should be considered a matter of course.
A recycling company will be happy to help you with professional disposal.
National guidelines and regulations for batteries and electronic components must also be observed.
Summary of Contents for NETLIGHT Quattro
Page 2: ...system documentation quattro GB V13 docx Page 2...
Page 3: ...system documentation quattro GB V13 docx Page 3...
Page 4: ...system documentation quattro GB V13 docx Page 4...
Page 27: ...system documentation quattro GB V13 docx Page 27 5 2 1 Terminal diagram X2 X4 X5...
Page 28: ...system documentation quattro GB V13 docx Page 28 5 2 2 Terminal diagram X6 X8 X9...
Page 29: ...system documentation quattro GB V13 docx Page 29 5 3 Mains connection panel connection...
Page 30: ...system documentation quattro GB V13 docx Page 30 5 4 Three phase monitoring X0...
Page 31: ...system documentation quattro GB V13 docx Page 31 5 5 Digital inputs 1 4 230V AC...
Page 56: ...system documentation quattro GB V13 docx Page 56...
Page 57: ...system documentation quattro GB V13 docx Page 57 Free for Test Report...
Page 58: ...system documentation quattro GB V13 docx Page 58 Free for Test Report...