5
Signet PVDF Conductivity Sensors
3
/
4
in. NPT or
ISO 7/1-R
3
/
4
In aerated vessels install the electrode in a stillwell to
prevent air from being trapped inside the electrode.
Fill with
3 to 4 in.
of sealant
1. Feed cable into watertight conduit.
2. Apply thread sealant to the electrode before threading conduit onto electrode. Avoid twisting the cable.
3. Secure cable with conduit or cable gland.
4. For additional defense against possible accumulation of condensation at the back seal area of the electrode,
fi ll the lower 75 mm to 100 mm (3 in. to 4 in.) of conduit or extension pipe with a fl exible sealant such as silicone.
8850-3
Conductivity Transmitter
locking ring
conduit base
8052 integral
adapter
electrode
Max cable length
15.2 cm (6 in.)
• 3-8052 Integral Kit and 3-9000.392-X Liquid Tight Connector kit are required. (See Parts and Accessories on back page).
• Cut the cable to approx. 15 cm (6 in.).
• Strip outer cable cover back 5 cm (2 in.).
• Strip each conductor to expose 1 cm (3/8 in.) of bare wire.
• Tin each conductor with solder for best results.
9900-1 Field Mount
with 8052 Integral Mounting Kit
and 9900.396 Angle Adjustment Adapter
Integral Installation
Submersible Installation