Fillmaster Table Top Filling Machine
A. INSPECTION UPON ARRIVAL
Your GEYER filler has received careful final inspection and has been test run
at the factory prior to shipment. It has been crated securely to insure delivery
without damage or loss of parts. Upon its arrival at your plant, please inspect the
shipment for any damage or loss in transit. If there is any noticeable damage,
please call us at (215) 379-1234. Be sure to keep all packing material (i.e. crate,
braces, and padding) for the first 30 days, in case machine needs to be returned
for repair or exchange.
B. LOCATING THE MACHINE
Your GEYER filler should be set up in a location which will allow enough
space around the machine for the operator and provide easy access for
maintenance purposes.
C. LEVELING THE MACHINE
Make sure that the machine is placed on a level surface.
D. ASSEMBLING THE MACHINE
Generally, after the filler has been tested in our plant, it is shipped to you set
up ready to operate. Remove all tape and other materials used in shipping the
machine. If any Parts are unattached for shipping purposes, follow the
instructions on the attached tags for re-assembly. If you have any questions
please call us for technical assistance.
E. AIR CONNECTIONS
Your machine has been supplied with an air Filter / Regulator, which is
necessary for air operation. You will need to run a line for your air compressor to
the trio unit. There is a dial indicator on the trio unit (directly above the pressure
gauge) for setting the required amount of air pressure (generally 100 psi). The
unit will already be preset from testing at the factory. However, depending upon
varying factors (different products, speeds, etc.) you will have to make
adjustments to this setting.
Note: All the air components on the Fillmaster are
self lubricating, No oil is needed.