![Gentherm CSZ Blanketrol II 222S Operation And Technical Manual Download Page 66](http://html1.mh-extra.com/html/gentherm/csz-blanketrol-ii-222s/csz-blanketrol-ii-222s_operation-and-technical-manual_2213792066.webp)
FIELD REPAIR/SERVICE
BLANKETROL II, Model 222S
OPERATION AND TECHNICAL MANUAL
Page 66 of 110
SECTION 5.
FIELD REPAIR/SERVICE OF THE BLANKETROL II UNIT
Complete the applicable parts of the First Time Set-Up/System Test Routine described in
Section (2-2.) to determine that the unit is operating.
5-0. INTRODUCTION
This section describes the repair and service task maintenance personnel can complete in the
field if a problem should occur. These tasks include servicing any of the following:
A. Membrane control panel
B. Heater
C. Microprocessor board
D. On/off power switch
E. Pump housing
F. Pump motor
G. Thermal disc
H. Upper and lower water manifolds
I. Water filter assembly
J. Water flow indicator
K. Water level sensor
L. Water temperature sensor
M. Beeper Assembly
The description of each task includes the tools, the procedures, and the precautions necessary
to complete the task. Maintenance, repair, and/or service of the BLANKETROL II by qualified
maintenance/technical personnel
will not
void the warranty of the unit.
WARNING
Always
unplug the unit
before accessing internal components during service.
Failure to unplug the unit could result in electric shock.
The repair, calibration, and servicing of the BLANKETROL II should be performed
by qualified Medical Equipment Service Technicians, Certified Biomedical
Electronics Technicians, or Certified Clinical Engineers familiar with good repair
practices for servicing medical devices, and in accordance with instructions
contained in this manual.
Improper repair can result in damage to the
BLANKETROL II system and patient injury.
No modification of this equipment is allowed without prior, written authorization
from CSZ.
Failure to do so may result in damage to the BLANKETROL II
system and patient injury.
Before
returning the BLANKETROL II to patient use
after
repairs, the FIRST
TIME SET-UP/SYSTEM TEST ROUTINE in Section 2 must
always
be performed.
Improper repair and inadequate maintenance can result in damage to the
BLANKETROL II system and patient injury.
Summary of Contents for CSZ Blanketrol II 222S
Page 112: ......