ENGLISH
Foundation
Steel rack
5.3 FOUNDATION PLATE
RISKS
PERSONAL PROTECTIVE EQUIPMENT
L
i
Before proceeding, check that the necessary cable glands have been
installed (§ 4.3).
The foundation plate and corresponding hardware are accessories
which are not included.
1. Assemble the foundation plate as shown in
; tighten the M10
nuts and lock nuts supplied, using two hex spanners.
2. Make a plinth, with reference to § 5.2 and
3. Pass the cable glands through the hole (
-1) and install the
foundation plate.
L
i
Do not bury the foundation plate in the concrete.
4. Use a spirit level, check that the plinth is horizontal and make any
adjustments before the concrete sets (