Service and Repair Manual
September 2015
Manifolds
52
Z-34/22 Bi-Energy
Part No. 1268515
9-2 Valve Adjustments - Function M anifol d
9-2 Valve Adjustments - Function
Manifold
How to Adj ust the System Reli ef Valve
How to Adjust the System Relief
Valve
Note: Perform this procedure with the boom in the
stowed position.
Note: Refer to Function Manifold Component list to
locate the system relief valve.
1 Connect a 0 to 5000 psi / 0 to 350 bar
pressure gauge to the test port on the function
manifold.
2 Move and hold the function enable toggle
switch to either side and hold the primary
boom extend/retract toggle switch in the
retract direction with the primary boom fully
retracted.
3 Observe the pressure reading on the pressure
gauge. Refer to Specifications,
Hydraulic
Specifications
.
4 Turn the machine off. Hold the system relief
valve with a wrench and remove the cap.
5 Adjust the internal hex socket. Turn it
clockwise to increase the pressure or
counterclockwise to decrease the pressure.
Install the relief valve cap.
Tip-over hazard. Do not adjust
the relief valve higher than
specified.
6 Repeat steps 2 through 4 and recheck relief
valve pressure.
7 Remove the pressure gauge.
How to Adj ust the Primary Boom Dow n R elief Valve
How to Adjust the Primary Boom
Down Relief Valve
Note: Perform this procedure with the boom in the
stowed position.
Note: Refer to Function Manifold Component list to
locate the primary boom down relief valve.
1 Connect a 0 to 3000 psi / 0 to 200 bar
pressure gauge to the test port on the function
manifold.
2 Turn the key switch to ground control and pull
out the red Emergency Stop button to the on
position.
3 Move and hold the function enable toggle
switch to either side and move and hold the
primary boom up/down toggle switch in the
down direction with the primary boom fully
lowered. Observe the pressure reading on the
pressure gauge. Refer to Specifications,
Manifold Component Specifications.
4 Turn the machine off. Hold the primary down
relief valve with a wrench and remove the
cap.
5 Adjust the internal hex socket. Turn it
clockwise to increase the pressure or
counterclockwise to decrease the pressure.
Then install the relief valve cap.
Tip-over hazard. Do not adjust
the relief valve higher than
specified.
6 Repeat steps 2 and 3 to confirm the relief
valve pressure setting.
7 Remove the pressure gauge.
Summary of Contents for Z-22 Bi-Energy
Page 63: ...September 2015 Service and Repair Manual Manifolds Part No 1268515 Z 34 22 Bi Energy 51...
Page 99: ...September 2015 Service and Repair Manual 87 Electrical Schematic from serial number 5427 CE...
Page 102: ...Service and Repair Manual September 2015 90 Electrical Schematic from serial number 5427 CE...
Page 103: ...September 2015 Service and Repair Manual 91 Ground Control Box Switch Panel Wiring Diagram...
Page 106: ...Service and Repair Manual September 2015 94 Ground Control Box Terminal Strip Wiring Diagram...
Page 107: ...September 2015 Service and Repair Manual 95 Platform Control Box Wiring Diagram...
Page 110: ...Service and Repair Manual September 2015 98 Power Cable Wiring Diagram...
Page 111: ...September 2015 Service and Repair Manual 99 Drive Contactor Panel Wiring Diagram...
Page 114: ...Service and Repair Manual September 2015 102 Manifold and Limit Switch Wiring Diagram...
Page 119: ...September 2015 Service and Repair Manual 107 Engine Wiring Diagram...
Page 123: ......