September 2015
Service and Repair Manual
Secondary Boom Components
Part No. 1268515
Z-34/22 Bi-Energy
37
45 Remove the pin retainer from the lower
compression arm to turntable pivot pin. Use a
slide hammer and remove the pin. Remove
the arm from the machine. Repeat for the
engine side lower compression arm.
Crushing hazard. If the overhead
crane is not properly attached,
the lower compression arms
could become unbalanced and
fall when it is removed from the
machine.
46 Attach the strap from the crane to the lower
secondary boom.
47 Remove the pin retainer from the lower
secondary boom to turntable pivot pin. Use a
soft metal drift to remove the pin.
48 Remove the lower secondary boom from the
machine.
Crushing hazard. If the overhead
crane is not properly attached,
the lower secondary boom could
become unbalanced and fall
when it is removed from the
machine.
5-2 Secondary Boom Lift Cyli nders
5-2
Secondary Boom Lift Cylinder
The secondary boom lift cylinder raises and lowers
the secondary boom. The secondary boom lift
cylinder is equipped with counterbalance valves to
prevent movement in the event of a hydraulic line
failure.
How to R emove the Secondary Boom Li ft Cyli nders
How to Remove the Secondary
Boom Lift Cylinder
Bodily injury hazard. This
procedure requires specific repair
skills, lifting equipment and a
suitable workshop. Attempting
this procedure without these
skills and tools could result in
death or serious injury and
significant component damage.
Dealer service is strongly
recommended.
Note: When removing a hose assembly or fitting,
the O-ring (if equipped) on the fitting and/or hose
end must be replaced. All connections must be
torqued to specification during installation. Refer to
Specifications,
Hydraulic Hose and Fitting Torque
Specifications.
1 Rotate the turntable to the side until the boom
is centered between the steer and non-steer
tires.
2 Raise the primary boom to full height. Do not
extend it.
3 Attach the strap from an overhead crane to
the lug on the rod end of the secondary boom
lift cylinder.
Summary of Contents for Z-22 Bi-Energy
Page 63: ...September 2015 Service and Repair Manual Manifolds Part No 1268515 Z 34 22 Bi Energy 51...
Page 99: ...September 2015 Service and Repair Manual 87 Electrical Schematic from serial number 5427 CE...
Page 102: ...Service and Repair Manual September 2015 90 Electrical Schematic from serial number 5427 CE...
Page 103: ...September 2015 Service and Repair Manual 91 Ground Control Box Switch Panel Wiring Diagram...
Page 106: ...Service and Repair Manual September 2015 94 Ground Control Box Terminal Strip Wiring Diagram...
Page 107: ...September 2015 Service and Repair Manual 95 Platform Control Box Wiring Diagram...
Page 110: ...Service and Repair Manual September 2015 98 Power Cable Wiring Diagram...
Page 111: ...September 2015 Service and Repair Manual 99 Drive Contactor Panel Wiring Diagram...
Page 114: ...Service and Repair Manual September 2015 102 Manifold and Limit Switch Wiring Diagram...
Page 119: ...September 2015 Service and Repair Manual 107 Engine Wiring Diagram...
Page 123: ......