Genie specifications require that this procedure be
performed every 8 hours or daily, whichever comes
first.
Testing the base for proper operation is essential
for safe machine operation. An unsafe working
condition exists if the base fails to operate properly.
The base should operate smoothly and be free of
hesitation, jerking and binding.
1
Pump the foot pedal 7 to 9 complete strokes.
Result: The non
-
adjustable foot pads should
raise 1 ½ to 2 inches / 4 to 5 cm off the ground.
2
Pull the base lowering handle.
Result: The base should lower, putting all four
foot pads in firm contact with the ground.
3
Raise the platform slightly.
Result: The inner frame wheels should lift off
the ground.
A-
8 T est the Auxiliary Pl atform Low ering Operati on
A-8
Test the Auxiliary Platform
Lowering Operation
Genie specifications require that this procedure be
performed every 8 hours or daily, whichever comes
first.
The auxiliary platform lowering is powered by a
secondary battery pack that is located in the
ground control box. The auxiliary platform lowering
can be activated from the ground or platform
controls. Detection of an auxiliary
lowering
malfunction is essential for safe machine operation.
An unsafe working condition exists if the auxiliary
platform lowering function does not operate in the
event of a main power failure.
1
Raise the platform slightly.
2
Disconnect the power source from the
machine.
3
Push in the auxiliary platform lowering button
at the gound controls.
Result: Platform should lower.
4
Connect the power source to the machine.
5
Raise the platform slightly.
6
Disconnect the power source from the
machine.
7
Push in the control activate button and rotate
the up/down switch in the down direction.
Result: Platform should lower.