
1-800-345-8207
25
Section 15 - Maintenance
The Nitrogen Generator features durable components and construction for long-lasting value, reliable performance, and
require little maintenance.
WARNING
All pressure must be relieved from the entire nitrogen generator system BEFORE servicing. To avoid system damage and/or personal
injury, the nitrogen generator should be isolated from the compressed air supply and the generator systemfully depressurized
before any maintenance or service is performed. All maintenance and troubleshooting activities for the Nitrogen Generator
should be performed by qualified personnel using reasonable care. Before servicing, isolate all risers by closing all AMD valves
and relieving all system pressure from the Nitrogen Generator. Failure to do so could result in serious injury or death.
Replacement Parts
Part
Replacement Part Number
MAINTENANCE KIT - M2-M5
NGP-MK
AIR MAINTENANCE DEVICE
AMD-1
NITROGEN ANALYZER
NGP-PSN2
SENSOR ELEMENT
F/NGP
VIBRATION KIT
NGP-VAK-30
OIL-LESS MINOR REPAIR KIT(1 PER CYL)
OLP-MRK-2.75
CYLINDER REPAIR KIT (1 PER CYL)
OLP-CRK-2.75
SOLENOID VALVE-AIR TANK DRAIN, FILTER DRAIN
G-04F25C2
OIL-LESS COMPRESSOR INTAKE FILTER ELEMENT (1 PER CYL)
OLP-IFK1
MEMBRANE - M2
NGP-M2
MEMBRANE - M3
NGP-M3
Air Compressor Maintenance Schedule
Weekly
• Drain condensate from receiver and traps
• Check for unusual noise or vibration
• Clean air filters (only with non-petroleum based products)
• Clean all external parts of the compressor and motor
Monthly
• Manually test safety relief valve
• Inspect air system for leaks
• Tighten fittings, nuts and screws as required
Quarterly
• Change Intake filter element
Schedule Maintenance Table
Part
Frequency
Coalescing Filters
Annually
Nitrogen Purity Analyzer
Sensor Battery as Required
Pressure Settings
Inspected Quarterly