
1-800-345-8207
17
5.
Open the petcock on the nitrogen storage tank
(bottom tank) and relieve the pressure until the
Nitrogen Solenoid light turns ON. See Figure 16.
The Nitrogen Solenoid light should turn on at 60±3
PSI on the nitrogen tank pressure gauge.
6.
The membrane pressure gauge should read between
85 and 105 PSI. See Figure 17.
7.
Record the time it takes for the nitrogen storage tank
to reach 75 PSI. It should typically take 14 minutes
for the NGP-1000D-M2, and 8 minutes for the
NGP-1000D-M3.
NOTE:
The air compressor will cycle on and off during
this process.