8.
When the nitrogen storage tank pressure reaches 75±3 PSI,
the Nitrogen Solenoid light will turn OFF and the nitrogen
membrane pressure will go to zero (0). See Figure 18.
9.
Repeat steps 5-8 a second time to ensure nitrogen storage
tank fill up times are consistent.
10.
On the second cycle, open the Nitrogen Test Port Valve
(Green Handle) located on the inside of the cabinet.
11.
Turn on the Nitrogen Analyzer. See Figure 19. For more
information on the Nitrogen Analyzer go to Nitrogen Analyzer
Instructions.
12.
Attach the Nitrogen Analyzer to the Nitrogen Test Port.
13.
The nitrogen purity level reading should climb to 98%+.
If not go to Troubleshooting.
14.
Close the Nitrogen Test Port Valve (Green Handle) and dis
connect the Nitrogen Analyzer. Make sure to power off the
Nitrogen Analyzer.
15.
Do not leave the Nitrogen Test Port Valve (Green Valve)
open for more than 2 minutes. The purity level may drop
and fill times will be lengthened.
16.
The system is now in operation.