
10
1-800-345-8207
CAUTION
Important: Read all of the safety information in this manual before installing or operating this equipment.
Section 4 - Uncrating and Inspection
1.
On arrival, do a full inspection by checking all packages and crates in the shipment for damage.
If damage is found, sign for the damage or refuse the shipment. Contact the carrier immediately and file
a shipping damage claim with the carrier.
2.
Check to ensure all components are contained and no visible damage has occurred during shipping.
3.
Each nitrogen generator requires a minimum of one Air Maintenance Device (AMD) and one Inspectors Gas
Analyzer Port (iGAP) per system. Check to see these components have arrived.
Item
Nitrogen cabinet
Air storage tank (top tank)
Nitrogen storage tank (bottom tank)
Nitrogen membrane (inside cabinet)
Manual (inside cabinet)
10 ft. ¼” condensation drain tube
Air Maintenance Device (One per riser)
Nitrogen Analyzer (One per job)
30” Stainless Steel Flex Hose
Vibration Isolation Pads
Floor Mounting Brackets
Item
Anchor bolts (fit ½” holes)
NPT piping from generator to system (½” or greater)
Dedicated electrical circuit with electrical disconnect
¼” drain tubing if more than 10 ft. is needed
½" ball valve for isolation
Crate Checklist:
AMD-1
NGP-PSN2
Required Accessories
Item
Inspectors Gas Analyzer Port (iGAP)
iGAP