
Step 9.Slide it inside the Stainless Steel Reactor Chamber (A) and cover
the end with the cover, so that the lamp does not come out.
Step 8.Place the Stainless Steel Reactor Chamber (A) horizontally and
slide the UV Lamp (F) inside the Quartz Sleeve(E).Attach the Ballast (G)
to the UV Lamp (F).
Till now, UV lamp is ready to be mounted .
The lamp can be mounted vertically or horizontally. For the first
time installation of the UV lamp, it is recommended that quartz
sleeve is installed in the horizontal position for better sealing
purposes. If the lamp installed vertically, the incoming water should
come from the bottom of the housing moving up
。
NOTE
7
www.geekpure.cc