Maintenance
71
Assembling
4.
Hold carrier (L2) with tubular hex. box spanner size 36 and tighten valve disk (15)
together with installed V-ring (94) with flexible head face spanner at (15.1).
5.
Insert locking flange (L3) into the lifting actuator (L1).
6.
Insert actuator (A) into the lifting actuator (L1) and fix with clamp joint (46).
Done