XMTC User’s Manual
45
Chapter 4. Calibration
4.4 Preparing the Transmitter for Calibration
Complete the following steps before connecting and adjusting the zero, span, and reference gases:
1.
Allow 30 minutes after power is turned on for the XMTC to reach temperature stability.
2.
Loosen the set screw that locks the XMTC cover in place, and unscrew the cover (see
Figure 53
below).
Figure 53: Transmitter Cover and Set Screw
Set Screw
Cover
Summary of Contents for XMTC
Page 1: ...GE Measurement Control Gas Analysis 910 217 Rev G October 2013 XMTC User s Manual ...
Page 2: ......
Page 4: ...ii no content intended for this page ...
Page 10: ...Contents viii XMTC User s Manual no content intended for this page ...
Page 18: ...Chapter 1 Features and Capabilities 8 XMTC User s Manual no content intended for this page ...
Page 58: ...Chapter 4 Calibration 48 XMTC User s Manual no content intended for this page ...
Page 62: ...Chapter 5 Specifications 52 XMTC User s Manual no content intended for this page ...
Page 68: ...Appendix A Supplemental Information 58 XMTC User s Manual no content intended for this page ...
Page 80: ...70 XMTC User s Manual no content intended for this page ...
Page 118: ...Index 108 XMTC User s Manual no content intended for this page ...
Page 120: ...Warranty 110 XMTC User s Manual no content intended for this page ...
Page 124: ... no content intended for this page ...
Page 125: ......