Typhoon
Operating Instructions
28-9623-56
AA
39
Operation 4
Performing a scanning 4.4
4.4 Performing a scanning
Note:
If radioactive samples are used the instrument should periodically be checked for
contamination from radioactive samples. Check the glass platen and the surface
of the inner lid according to Checking for contamination‚ on page 56.
Scanning recommendations
If time is critical for the experiment, make sure the instrument is ready to scan by
checking the instrument state
Typhoon instrument states‚ on page 43
•
If the instrument state is
Ready
, you can select the scan parameters, place the
screen on the glass platen, and start the scan.
•
If the instrument is in the
Sleep
state, click the
Initialize Scanner
button to bring
the instrument to the
Ready
state. The Instrument will be in
Warming Up
state for
approximately 5 minutes, during which the scan parameters can be selected
Load sample or Storage phosphor screen to instrument
1
Open the sample lid (A) by grasping the lid release under the center front of the
sample lid (B) and pull the release forward until the lid opens. Raise the lid all the
way.
2
Inspect and clean of the instrument before use.
a) Clean the glass platens before and after every scanning, see
for instructions.
b) Inspect and, if required, clean the sample lid inner surface according to
A
A
B
Summary of Contents for Typhoon 9200
Page 2: ...GE Healthcare Typhoon Operating Instructions Original instructions...
Page 3: ......
Page 13: ...1 Introduction 1 4 Control software 12 Typhoon Operating Instructions 28 9623 56 AA...
Page 27: ...3 Installation 3 5 Spare parts and accessories 26 Typhoon Operating Instructions 28 9623 56 AA...
Page 75: ...Appendix A Accessories A 4 Beamsplitters 74 Typhoon Operating Instructions 28 9623 56 AA...
Page 76: ......