Introduction
1-22
Vivid T9/Vivid T8 – Basic Service Manual
5795591-100 English Rev. 3
1-8 Lockout/Tagout (LOTO)
requirements
Follow Lockout/Tagout requirements by ensuring you are in total
control of the AC power plug at all times during the service
process.
To apply Lockout/Tagout (LOTO):
1. Plan and prepare for shutdown.
2. Shutdown the equipment.
3. Isolate the equipment.
4. Remove/disconnect the battery, if present.
5. Apply Lockout/Tagout Devices.
6. Control all stored and residual energy.
7. Verify isolation.
All potentially hazardous stored or residual energy is relieved.
WARNING
Energy Control and Power Lockout for Vivid T9/Vivid T8.
When servicing parts of the Ultrasound system where there is
exposure to voltage greater than 30 volts:
1. Follow LOCK OUT/TAG OUT procedures.
2. Turn off the breaker.
3. Unplug the Ultrasound system.
4. Maintain control of the Ultrasound system power plug.
5. Wait for at least 30 seconds for capacitors to discharge as
there are no test points to verify isolation.
6. Remove/disconnect the battery, if present.
Ultrasound System components may be energized.
Summary of Contents for T8
Page 5: ...Vivid T9 Vivid T8 Basic Service Manual i 3 5795591 100 English Rev 3 ...
Page 6: ...i 4 Vivid T9 Vivid T8 Basic Service Manual 5795591 100 English Rev 3 ...
Page 7: ...Vivid T9 Vivid T8 Basic Service Manual i 5 5795591 100 English Rev 3 ...
Page 8: ...i 6 Vivid T9 Vivid T8 Basic Service Manual 5795591 100 English Rev 3 ...
Page 9: ...Vivid T9 Vivid T8 Basic Service Manual i 7 5795591 100 English Rev 3 ...
Page 10: ...i 8 Vivid T9 Vivid T8 Basic Service Manual 5795591 100 English Rev 3 ...
Page 11: ...Vivid T9 Vivid T8 Basic Service Manual i 9 5795591 100 English Rev 3 ...
Page 12: ...i 10 Vivid T9 Vivid T8 Basic Service Manual 5795591 100 English Rev 3 ...
Page 13: ...Vivid T9 Vivid T8 Basic Service Manual i 11 5795591 100 English Rev 3 ...
Page 14: ...i 12 Vivid T9 Vivid T8 Basic Service Manual 5795591 100 English Rev 3 ...
Page 15: ...Vivid T9 Vivid T8 Basic Service Manual i 13 5795591 100 English Rev 3 ...
Page 20: ...i 18 Vivid T9 Vivid T8 Basic Service Manual 5795591 100 English Rev 3 ...
Page 28: ...i 26 Vivid T9 Vivid T8 Basic Service Manual 5795591 100 English Rev 3 ...
Page 158: ...System Setup 3 78 Vivid T9 Vivid T8 Basic Service Manual 5795591 100 English Rev 3 ...
Page 210: ...Service Adjustments 6 4 Vivid T9 Vivid T8 Basic Service Manual 5795591 100 English Rev 3 ...
Page 308: ...Renewal Parts 9 12 Vivid T9 Vivid T8 Basic Service Manual 5795591 100 English Rev 3 ...
Page 344: ...Care and Maintenance 10 36 Vivid T9 Vivid T8 Basic Service Manual 5795591 100 English Rev 3 ...
Page 349: ...GE ...