![GE ReadyToProcess WAVE 25 Operating Instructions Manual Download Page 67](http://html.mh-extra.com/html/ge/readytoprocess-wave-25/readytoprocess-wave-25_operating-instructions-manual_128043067.webp)
In dual mode, the process picture shows two Cellbag bioreactors on the rocker picture,
with separate control icons for the individually controlled parameters in each bioreactor.
Icons for the left-hand bioreactor are in the upper half of the process picture and icons
for the right-hand bioreactor in the lower half.
Identifying system components in the process picture
This section describes how to identify the units in the process picture with respect to the
Cellbag bioreactors in single and dual mode.
•
The left- and right-hand Cellbag bioreactors in dual mode are controlled by the CBCU
units with CAN ID 1 and 2 respectively. They are shown on the left and right sides of
the tray in the process picture. To avoid confusion, place the physical CBCU units on
the left and right sides of the tray as viewed from the front of the rocker.
•
Connections between the Cellbag bioreactor(s) and the respective monitor and active
control units are indicated by connection lines in the process picture.
•
Pump units are identified in the process picture as 1, 2 or 3 according to their CAN
ID setting, and the pump heads on each unit are designated A (left) and B (right).
In dual mode, pump roles for the left and right Cellbag bioreactors are labelled L and
R respectively.
Examples:
Pump 25: 1B refers to the right-hand pump head on the pump unit with CAN ID 1.
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
67
3 System description
3.6 UNICORN software overview
3.6.3 System control