![GE ReadyToProcess WAVE 25 Operating Instructions Manual Download Page 118](http://html.mh-extra.com/html/ge/readytoprocess-wave-25/readytoprocess-wave-25_operating-instructions-manual_128043118.webp)
Action
Step
Lower the flip top until it clicks into its fully closed position.
5
Connect inlet and outlet tubing to the Cellbag bioreactor, for example acid,
base, feed and harvest.
6
The pumping direction is indicated by the arrow on the pump head.
Note:
118
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
5 Operation
5.1 Set up the system
5.1.5 Prepare the pump